Cochise County is requesting proposals for underground and above-ground installation of approximately 4,700 linear feet of sanitary sewer infrastructure serving the West Douglas Utilities Expansion, with proposals due August 28, 2026.

The scope comprises 15-inch PVC SDR-35 and 15-inch welded steel pipe, beginning at the SR 80 crossing approximately 600 feet west of Copper Avenue and terminating approximately 400 feet south of SR 80 along US 191, where it ties into the Chino Road sanitary sewer system. Installation is primarily by open trench along the SR 80 embankment within Arizona Department of Transportation right-of-way. The system spans Whitewater Draw via single-span utility bridge with abutments on either side of the draw and outside the FEMA floodway. The contract is governed under RFP procedures. Questions are due by August 28, 2026.

Opportunity text

2 versions

Update #2 · Latest ·

Underground and above ground installation of approximately 4,700 LF of sanitary sewer. the sanitary sewer system consists of 15" PVC SDR-35 and 15" welded steel pipe, beginning at the SR80 crossing approximately 600 ft west of copper avenue and terminates approximately 400 LF south of the SR80 along US. 191, tying into the chino road sanitary sewer system. the sanitary sewer system will be installed primarily by open trench along the state route 80 embankment within ADOT row. the sanitary sewer system will span the whitewater draw crossing via single span utility bridge, with abutments on either side of the draw and outside of the FEMA floodway.

Update #1 ·

Underground and above ground installation of approximately 4,700 LF of sanitary sewer. the sanitary sewer system consists of 15" PVC SDR-35 and 15" welded steel pipe, beginning at the sr80 crossing approximately 600 ft west of copper avenue and terminates approximately 400LF south of the SR80 along US 191, tying into the Chino Road sanitary sewer system. the sanitary sewer system will be installed primarily by open trench along the SR 80 embankment within ADOT row. the sanitary sewer system will span the whitewater draw crossing via single span utility bridge, with abutments on either side of the draw and outside of the FEMA floodway.