RFP West Douglas Utilities Expansion, Kings Highway
Open State & local contract opportunity Posted
- Solicitation number
- RFP 2027 PW 004
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Rene Rios rene.rios@douglasaz.gov (520) 417-7317
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Cochise County is requesting proposals for the West Douglas Utilities Expansion project, involving underground installation of approximately 2,700 linear feet of 12-inch PVC SDR-35 sanitary sewer and optional water-line crossing infrastructure near Douglas, Arizona, with proposals due October 27, 2026.
The scope includes sanitary sewer construction originating at the intersection of State Route 80 and Kings Highway, running southward to the southern property line of the existing United States Border Patrol facility. Alternate 1 provides for an open-cut crossing of State Route 80 at the James Ranch Road alignment and installation of a 16-inch ductile iron pipe waterline connecting existing utilities north of State Route 80 to proposed utilities south of the highway. Alternate 2 offers a trenchless crossing of State Route 80 at the same alignment with the same waterline installation scope. The project serves an existing Border Patrol facility and the proposed commercial port of entry approximately three miles west of Douglas.
No set-aside, preference program, contract value, incumbent, evaluation criteria, or pre-bid meeting date appears in the source.
Opportunity text
This project includes the underground installation of approximately 2700 Ft of sanitary sewer to support existing border patrol facility and the proposed commercial port of entry located approximately three miles west of Douglas, Arizona. The sanitary sewer system, constructed with 12" PVC SDR-35 piping, originates at the intersection of State Route 80 and Kings Highway, runs southward, and terminates at the southern property line of the existing united states border patrol facility. Alternate 1 includes an open-cut crossing of State Route 80 at the James Ranch Road alignment and installation of a 16" ductile iron pipe (DIP) waterline connecting the existing utilities north of State Route 80 to the proposed utilities south of state route 80. Alternate 2 includes a trenchless crossing of State Route 80 at the James Ranch Road alignment and installation of a 16" ductile iron pipe (DIP) waterline connecting the existing utilities north of State Route 80 to the proposed utilities south of State Route 80
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity