RFP FY26-06 Engineering for Sawyer Hill Road Culvert

Open State & local contract opportunity Posted

Solicitation number
FY26-06
State
Vermont
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from vermontbusinessregistry.com. Updated .

About this opportunity

The Town of Mount Holly, Vermont is soliciting proposals from qualified engineering firms under RFP FY26-06 for bidding and construction documents and permitting to replace the Sawyer Hill Road culvert, with proposals due November 24, 2026. The procurement carries no set-aside, preference, or sole-source designation in the source.

The work covers overall plans, stream profile and cross sections, and project specifications for a new precast concrete box culvert on TH-45 Sawyer Hill Road, crossing an unnamed tributary to Branch Brook about 0.15 miles north of VT-103 in Mount Holly, Rutland County. The firm must also obtain permits from the Vermont Agency of Natural Resources (Rivers and Streams and Wetlands) and the U.S. Army Corps of Engineers. The existing structure is a deteriorated squashed corrugated metal pipe (4.5 ft clear span by 3.6 ft clear height, about 13 square feet of waterway opening) with a rotted bottom. It is listed in urgent condition on VTCulverts.org and overtops the roadway at the 10% AEP storm. Sawyer Hill Road is a Class 3 gravel road serving approximately 33 homes.

The project is funded through a VTrans Structures Grant. The town will issue separate RFPs for replacement culvert material, where its preference is Plate Arch, and for construction.

Opportunity text

The Town of Mount Holly is seeking proposals from qualified engineering firms to prepare bidding and construction documents (overall plan and stream profile and cross section, and project specifications) and permits (ANR Rivers and Streams and Army Corp of Engineers and ANR Wetlands) for a new precast concrete box culvert to replace the existing culvert on TH-45 Sawyer Hill Road over an unnamed tributary to Branch Brook in Mount Holly, VT (approximately 0.15 miles north of VT-103). The existing structure is a deteriorated squashed corrugated metal pipe (4.5 ft clear span x 3.6 ft clear height, approximately 13 square feet of waterway opening) with a rotted bottom. It is listed in urgent condition on VTCulverts.org and overtops the roadway at the 10% AEP storm. Sawyer Hill Road is a Class 3 gravel road and is the access for approximately 33 homes. The town has a VTrans Structures Grant for the replacement. The town will prepare one RFP for purchase of replacement culvert material (town preference is Plate Arch) and one for construction.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors