The Town of Brookline, Vermont is requesting proposals for engineering design services to replace a culvert on Grassy Brook Road (TH-10), with proposals due November 18, 2026. The project is funded through a VTrans Structure Grant and targets construction in 2027.

The existing structure is a 24-foot-long, 74"×120" corrugated metal pipe; the selected firm must design a replacement that meets H&H study recommendations and ANR specifications. Scope includes site visit and field assessment, review of the provided Hydrologic and Hydraulic study, design of replacement culvert with associated headwalls and road base restoration, design of temporary bypass to maintain road access during construction, preparation of construction-ready plans and specifications, cost estimates, identification of applicable codes and permitting requirements, and bid documents for structure construction.

Deliverables comprise site assessment reports, design drawings and specifications for the culvert, construction cost estimates, a summary of permitting and regulatory requirements, and bid documents for structure construction. All deliverables must be completed to enable construction in 2027.

Proposals must include a cover letter and firm profile, documentation of relevant experience with culvert design and VTrans-funded projects, resumes of key personnel, a composite schedule detailing all prime and subconsultant work with specific activities, tasks, personnel involvement, and hour estimates, and a cost proposal with anticipated costs. The selected firm is expected to deliver a cost-effective design aligned with H&H study recommendations.

Opportunity text

Town of Brookline, Vermont Request for Proposals (RFP) Engineering Design Services - Grassy Brook Road Culvert 1. Introduction The Town of Brookline is seeking proposals from qualified engineering firms to provide professional services for the design of a culvert replacement. The culvert is currently funded for engineering services through a VTrans Structure Grant. The selected firm will be expected to deliver a cost-effective design that aligns with the recommendations of the provided Hydrologic and Hydraulic (H & H) study. 2. Project Background The culvert is located on: Grassy Brook Road (TH-10) over Grassy Brook (43.051395, -72.59101) Existing structure: 24 ft long, 74"x 120" corrugated metal pipe (CMP) New structure will meet the requirements specified in the H & H study and in accordance with ANR specifications 3. Scope of Services The selected firm will be expected to: Conduct site visit and field assessment Review the H & H study and design replacement culverts, including associated headwalls, road base, and surface restoration, in accordance with study recommendations, and design temporary bypass to avoid total road closure Prepare construction-ready plans and specifications Provide cost estimates Identify applicable codes, standards, and permitting requirements Deliverables: Site assessment reports Design drawings and specifications for the culvert Cost estimates for construction Summary of permitting and regulatory requirement Bid documents for structure construction Deliverables must be completed to allow construction of structure in 2027 4. Proposal Requirements Firms should submit: Cover letter and firm profile Relevant experience with culvert design and VTrans-funded projects Resumes of key personnel A composite schedule, including all prime and subconsultant work, specific activities and tasks to be performed, individual(s) and/or subconsultants to be involved, and an estimate of hours associated with each. A cost proposal including anticipated costs of delivery, phone, travel, photocopies, etc. A combination of hourly and/or lump sum quotes may be submitted. Include the hourly rates of involved personnel in the event that further services beyond, or adjustments to, the final project scope of work is desired. Provide in the cost proposal a composite schedule by tasks that corresponds with the deliverables above, including direct labor hours, direct labor cost per class of labor, and total cost of each task. The prime and each subconsultant will be included in the composite schedule. References from comparable municipal clients A contract, if awarded, will be based upon hourly rates or lump sum and an agreed final scope of work. 5. Evaluation Criteria Proposals will be evaluated based on: Experience with similar projects Qualifications of assigned personnel Understanding of project goals Proposed approach and timeline Cost-effectiveness References and past performance 6. Pre-Bid Meeting Proposers will be responsible for making themselves familiar with the project area and details. However, a pre-bid meeting will also be held on Tuesday, October 27, 2026, 9:00 a.m., at the site on Grassy Brook Road. 7. Submission Instructions: Proposals must be submitted by November 18, 2026 BY MAIL: Town of Brookline Town Office, PO Box 403, Brookline, VT 05345 BY EMAIL: brook763@comcast.net For further information call E. Mark Bills, Highway Supervisor: Email: emarkbills.brooklinevt@gmail.com Phone: 802-258-1389 Timeline RFP Issued: October 8, 2026 Proposals Due: November 18, 2026 Selection: December 2, 2026 Additional Information The Town reserves the right to reject any or all proposals, negotiate scope and fees, and award the contract in the best interest of the Town.

Files

File Type Posted
RFP-Engineering Design Services.pdf PDF
Hydraulic-Study.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors