RFP 26. 02 - Snack Bar Replacement Project
Closed State & local contract opportunity Posted
- Solicitation number
- 26.02
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP code
- UNSPSC code
- Point of contact
-
- Purchasing bids@bmtisd.com (409) 617-5041
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The Beaumont Independent School District (BISD) is seeking proposals for RFP 26.02, a Snack Bar Replacement Project at Marshall Middle School. The procurement involves the procurement and installation of specific food service equipment, including a custom serving counter with touchscreen digital controls, a 36" milk display case, a two-section heated cabinet, a two-section reach-in refrigerator, and comprehensive turnkey installation services. Proposals will be evaluated using a 100-point scoring system, with 60 points allocated to pricing, 10 points for project experience and reputation, 15 points for goods and service quality, and 10 points for meeting district needs. A pre-proposal conference is scheduled for Monday, June 23, 2025, at 10:00 a.m. at the school location, with proposals due on Monday, July 28, 2025, at 2:00 p.m. Vendors must submit three proposal copies, include proof of insurability, complete Form 1295, and provide all required vendor packet forms. The project must be completed when school is not in session, with installation dates coordinated through the BISD Director of Child Nutrition and board contract approval estimated for August 21, 2025.
The district has specific vendor preferences, including consideration for businesses with their principal place of business in Texas or those employing at least 500 people in the state. The RFP allows for "or equal" alternatives to the specified manufacturers, providing some flexibility in equipment selection while maintaining technical standards. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the district reserves the right to accept or reject any proposal based on factors including past vendor relationships and total long-term costs. The project requires factory-approved installation complying with local municipal codes, with work performed during normal business hours. The installation scope includes disconnecting existing utilities, removing and disposing of the current serving line, making electrical modifications, installing new equipment, and conducting functional testing. Although a specific budget range is not provided, the comprehensive specifications and detailed equipment requirements suggest a significant investment in modernizing the school's food service infrastructure.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity