RFB 2023-500 Electric System Construction
Awarded State & local contract opportunity Posted
- Solicitation number
- 2023-500
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC code
- Point of contact
-
- Rashida Fairley rfairley@hamptonga.gov (770) 946-4306
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Hampton, Georgia solicited bids on electric utility line construction under RFB 2023-500, with bids due May 3, 2023 and prequalification documents required before receipt of the full RFB package. This is a labor-only contract with contractor-supplied materials including stone, concrete pole backfill, and erosion control items.
The project scope consists of reconducting and rebuilding approximately 0.75 miles of three-phase 1/0 ACSR (Raven) conductor to 750 AAC (Cattail) and approximately 0.25 miles of three-phase 1/0 ACSR (Raven) to 336 ACSR (Merlin), along with required right-of-way vegetation clearing. The RFB was released on April 5, 2023. Qualified Electric Utility Line Contractors were the eligible bidder class; all prospective bidders were required to submit prequalification documents for vetting before receiving the full RFB package.
U-TEC Construction, Inc. was awarded the contract at $350,328.66.
Opportunity text
The City of Hampton of Hampton, Georgia will be soliciting Request for Bids (RFB) from qualified Electric Utility Line Contractors for planned Distribution (medium voltage) Electric Utility Line Improvements. All prospective Bidders/Contractors will be required to complete and submit prequalification documents for review. All prequalification documents submitted will be vetted before an RFB package is offered. Project Scope: This will be a labor-only contract, other than specific Contractor supplied materials that are listed in the RFB (i.e.: stone or concrete pole backfill, erosion items, etc.). The project will consist of reconducting/rebuilding approximately 0.75 miles of three-phase 1/0 ACSR (Raven) to 750 AAC (Cattail) and reconducting/rebuilding approximately 0.25 miles of three-phase 1/0 ACSR (Raven) to 336 ACSR (Merlin). There will be electric utility line right-of-way vegetation clearing required along these routes. The RFB is being released on April 5, 2023An RFB will only be supplied to Qualified Contractors. Please see the website for more information.