RFB 2023-088 Inverness Lift Station Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- RFB2023-088
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 41114600 Metals and metallurgy and structural materials testing instruments
- 41103315 Solution strength estimation apparatus
- 41114601 Abrasion testers
- 41114602 Compression testers
- 41114604 Corrosion testers
- 41114605 Crack or corrosion detectors
- 41114606 Creep testers
- 41114607 Ductility testing machines
- 41114608 Fatigue testers
- 41114609 Forging testing apparatus
Show all 22
- 41114610 Foundry testing apparatus
- 41114611 Hardness testers
- 41114612 Impact testers
- 41114613 Load frame
- 41114614 Metal testing instruments
- 41114615 Photoelastic testing instruments
- 41114616 Proofstress indicators
- 41114617 Relaxation testers
- 41114706 Wood testing instruments
- 41114707 Textile or paper strength tester
- 47101533 Lift stations
- 81101500 Civil engineering
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The City of Waco, Texas, located in McLennan County, has issued Request for Bid (RFB) 2023-088 for the Inverness Lift Station Improvements project. The scope of work involves the replacement of a 4-inch ductile iron pipe discharge line for two pumps at the Inverness Lift Station, including the replacement of pipe, bends, gate valves, coupling adapters, dismantling joints, and other fittings. The project also requires the removal and replacement of pipe in a wet well and concrete vault, bypass pumping in a residential neighborhood, and concrete surface replacement. Bidders must attend a mandatory pre-submittal meeting on January 10, 2024, and submit their bids by January 25, 2024, at 2:00 PM CT. The City estimates the work will be completed within 90 calendar days from the Notice to Proceed and will award the contract to the lowest responsible bidder or the bidder providing the best value. The project has an estimated construction cost of $150,400, and the liquidated damages are $1,000 per day of delay.
The solicitation does not provide details on any set-aside designations or restrictions on the types of organizations that can respond. It also does not list any incumbent vendors or current contractors, nor does it mention any existing infrastructure or technology that requires integration. The solicitation also does not specify any possible award values or budget ranges beyond the estimated construction cost of $150,400.
Opportunity text
Replacement of 4" ductile iron pipe discharge line for two pumps at the Inverness Lift Station. Includes replacement of 4" pipe, bends, gate valves, coupling adapters, dismantling joints and other fittings. Removal and replacement of pipe in a wet well and concrete vault will be required. Bypass pumping in a residential neighborhood and concrete surface replacement will also be required.