Resurfacing

Open State & local contract opportunity Posted

Solicitation number
T3A41
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Florida Department of Transportation is soliciting bids for resurfacing SR 63 (US 27/Monroe Street) from SR 263 (Capital Circle) to north of John Knox Road in Leon County, with the letting scheduled for December 2, 2026. No set-asides are indicated in this solicitation.

The scope covers milling and resurfacing of existing travel lanes, auxiliary lanes, median crossovers, and paved shoulders over 6.050 miles. It also includes median access changes, sidewalk additions, signalization improvements, and correction of design deficiencies such as deficient sidewalks, non-compliant curb ramps, clear space requirements, and pedestrian signal features. The work restripes Bridges #550068 and #550085 over SR 8 (I-10) and proposes no improvements to Culvert #550003. Principal work items include mobilization, maintenance of traffic, sediment control, clearing and grubbing, milling of approximately 309,310 square yards of existing asphalt, and Superpave asphaltic concrete and friction course totaling approximately 45,700 tons. The highway contractor performs utility adjustments to manholes and valves owned by City of Tallahassee Water and Sewer, City of Tallahassee Power, and CenturyLink aka Lumen.

The flexible proposal budget estimate is $13.7 million. The contract allows 435 contract days, a 10-day contract execution window, and a 120-day flexible start time. Federal aid applies to the primary project under FPID 452939-1-52-01 (Federal Aid No. D326038B), while utility FPIDs 452939-1-52-02 through 452939-1-52-04 are non-federally aided.

Opportunity text

The improvements under this Contract (FPID 452939-1-52-01) consist of resurfacing SR 63 (US 27/Monroe St) from SR 263 (Capital Cir) to N of John Knox Rd in Leon County. This project will primarily consist of milling and resurfacing the existing travel lanes, auxiliary lanes, median crossovers, and paved shoulders. In addition to the resurfacing, the scope of services for this project includes median access changes, sidewalk additions, signalization improvements, and addresses design deficiencies such as deficient sidewalks, non-compliant curb ramps, clear space requirements, and pedestrian signal features. The project will include restriping of existing Bridge #550068 and Bridge #550085 over SR 8 (I-10). There are no proposed improvements to Bridge Culvert #550003 over Meginnis Arm. Utility Work by Highway Contractor will include adjustments to manholes and valves owned by the City of Tallahassee Water and Sewer under FPID 452939-1-52-02, City of Tallahassee Power under FPID 452939- 1-52-03, and CenturyLink aka Lumen (Local) under FPID 452939-1-52-04.

Files

File Type Posted
T3A41BSN.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors