The Florida Department of Transportation, District 03, is requesting bids on resurfacing and roadway improvements on State Road 75 (US 231) in Jackson County, with a proposal due September 30, 2026. The project encompasses approximately 1.399 miles of roadway from south of SR 10 (US 90) to the end of curb and gutter, including curb ramp reconstruction, replacement of strain poles for overhead school zone signage, signing and pavement marking upgrades, driveway reconstruction, and signal timing upgrades. The scope includes milling of existing asphalt pavement (approximately 54,643 square yards across two depth specifications), placement of superpave asphaltic concrete and friction course materials (totaling approximately 5,769.6 tons), concrete curb and gutter installation (796 linear feet), concrete sidewalk and driveway work (403 square yards), and comprehensive signing and pavement marking work. Signalization work encompasses conduit installation via open trench (60 linear feet) and directional bore (1,575 linear feet), signal cable installation, span wire assemblies, pull and splice boxes, prestressed concrete poles, inductive loop detectors, traffic controllers, and luminaire replacement. The project requires substantial traffic control measures including maintenance of traffic, traffic control officer coverage (88 hours), work zone signage (15,772 displays), and channelizing devices (37,424 units). The flexible proposal budget estimate is $2,371,025.00. Contract duration is 200 days for work completion plus 10 days for contract execution, with a flexible start time of 60 days from contract execution. The project spans 49.050 acres and includes sediment and erosion control and environmental site management. The letting date is September 30, 2026. Federal aid applies to project 45293315201; project 45293315202 carries no federal aid designation.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
T3A23BSN.pdf | 117KB | 9/21/26 |