About this opportunity
The City of Miami Beach, Florida is requesting quotes for restroom renovation at Miami Beach Convention Center, specifically removal and replacement of Level 2 Men's Restroom stall doors and sidelites with new Carvart glassENCLOSE full-height cubicle fronts, with quotes due September 24, 2026 at 3:00 PM ET and a mandatory site visit on September 9, 2026 at 10:00 AM.
All work must be performed by a State of Florida Certified General Contractor. The scope includes complete demolition of existing stall doors, sidelites, and hardware; establishment of a staging area for salvage and sorting; installation of 8 standard cubicles, 1 ambulatory cubicle, and 1 ADA cubicle with Carvart glassENCLOSE BO6 Winter White panels and Satin Anodized hardware finish or approved equal; and reinstallation of salvaged doors, locks, hinges, and hardware in other MBCC restroom locations. Required hardware includes 2 ADA pulls with indicator, 10 coat hooks, 10 bumpers, and 1 ADA ladder pull (18", single-sided). The contractor must coordinate delivery and installation with MBCC staff, maintain daily debris removal, protect finished surfaces, and maintain safe access routes throughout the project.
The estimated budget is $100,000 with a $10,000 permit allowance. Pricing must be submitted as a lump sum including all labor, tools, materials, equipment, mobilization, permits, sales tax, and overhead. A 5% bid bond is required. Substantial completion is required within 120 days from notice to proceed, with final completion within 30 days thereafter. Liquidated damages of $200 per day apply for failure to meet both substantial and final completion dates. Performance and Payment Bonds equal to 100% of contract price are required if award exceeds $200,000. Required insurance includes Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence / $2,000,000 aggregate), Automobile Liability ($1,000,000 combined per accident), and Installation Floater Insurance with the City named as additional insured and loss payee. Questions are due September 17, 2026 at 10:00 AM ET. Davis-Bacon wage rates do not apply.
Opportunity text
Description of Work: This project consists of the complete removal of all stall doors and sidelites in the Level 2 Mens Restroom at the Miami Beach Convention Center, installation of new Carvart glassENCLOSE fullheight cubicle fronts or approved equal, and reuse of salvaged doors, locks, hinges, and hardware to repair other restroom locations. Work includes demolition, staging, installation of new cubicles, and reinstallation of salvaged components. General Conditions: All work to be executed by a State of Florida Certified General Contractor. Pricing to include all labor, tools, materials, equipment, and mobilization. Any change order must be approved by the Project Manager prior to beginning work. Contractor is to provide pricing for work to be performed during business hours. Vendor will be responsible for all permits, as required. Sales tax are to be included in bid. Contractor shall maintain the site free of debris, and trash is to be picked up daily. The contractor shall use only those cleaning materials and methods that will not create hazards to health or property and will not damage surfaces. Contractor to coordinate delivery appointments and installation schedule with MBCC staff Contractor responsible for protecting finished surfaces and maintaining safe access routes Scope of Work: Remove all existing stall doors, sidelites, and hardware from Level 2 Mens Restroom Establish staging area for sorting and hardware removal Salvage doors, hinges, locks, and hardware for reuse in other MBCC restrooms Provide and install Carvart glassENCLOSE full-height fronts or approved equal with BO6 Winter White panels and Satin Anodized hardware finish or approved equal Install 8 Standard cubicles, 1 Ambulatory cubicle, and 1 ADA cubicle Provide hardware package including 2 ADA pulls with indicator, 10 coat hooks, 10 bumpers, and 1 ADA ladder pull (18", single-sided) Reinstall salvaged doors, locks, hinges, and hardware in other MBCC restroom locations Workspace must be free and clear of other trades Contractor responsible for protecting finished surfaces and maintaining safe access routes
Files
| File | Type | Posted |
|---|---|---|
| miami bCITY OF MIAMI BEACH_ FLORIDA.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity