The City of Anaheim is soliciting bids for sanitary sewer and roadway widening improvements along Katella Avenue in the resort area, with proposals due July 30, 2026.

The scope encompasses construction of a new 21-inch VCP sewer along Katella Avenue between Disneyland Drive and Harbor Boulevard, and replacement of existing 21-inch and 24-inch sewers with a new 30-inch VCP sewer between Walnut Street and Harbor Boulevard. Roadway improvements include a fourth westbound traffic lane and pedestrian sidewalk. Street rehabilitation consists of 2-inch and 3-inch asphalt concrete pavement cold mill and overlay per City of Anaheim standards. Ancillary work includes sewer pipeline removal and disposal, construction and connection of new and existing manholes, connection of existing sewer service laterals to the new pipeline, sewer bypassing to maintain service continuity, trench restoration, sheeting and shoring, pavement grind and capping, replacement of inductive loop detectors and signal conduit, traffic striping and pavement marker replacement, temporary traffic control measures, adjustment of utility covers, implementation of a Water Pollution Control Program and Best Management Practices, and appurtenant work as shown on plans and delineated in specifications.

The source does not specify a contract value, contract term, estimated budget, place of performance beyond Katella Avenue, set-aside or preference program, incumbent contractor, evaluation criteria, pre-bid meeting date, site visit schedule, or questions deadline. The attached project description document does not contain pricing terms, bid deadlines, award dates, funding sources, or bidder requirements beyond the scope of work outlined above.

Opportunity text

The sanitary sewer improvements will consist of constructing a new 21-inch VCP sewer along Katella Avenue between Disneyland Drive and Harbor Boulevard. In addition, the existing 21-inch and 24-inch sewer will be replaced with a new 30-inch VCP sewer along Katella Avenue between Walnut Street and Harbor Boulevard. The project also includes roadway widening improvements such as constructing a new fourth westbound traffic lane and a pedestrian sidewalk. Lastly, the project requires street rehabilitation improvements such as 2-inch and 3-inch asphalt concrete pavement cold mill and overlay in accordance to the City of Anaheim standards. In addition to the work described above, the following scope items are typical: sewer pipeline removal and disposal; construction of new manholes; connection of existing sewers to new manholes; connecting a new sewer to an existing manhole; connection of existing sewer service laterals to the new sewer pipeline; sewer bypassing to maintain sewer service; trench restoration; sheeting, shoring, and bracing; grind and cap paving; replacement of inductive loop detectors and signal conduit; replacement of traffic striping and pavement markers; temporary traffic control measures; adjustment of manhole covers, water valve covers, and gas valve covers; implementation of a Water Pollution Control Program and Best Management Practices; and all appurtenant work as shown on the plans and delineated in the specifications.