About this opportunity

The state and local contract opportunity is for the replacement of two irrigation wells at Larter Field in Dunstable, Massachusetts. The Town of Dunstable is the awarding authority, and the project involves mobilizing the site, disconnecting the existing pump, removing the existing wells, installing new stainless steel well screens and 2-inch pipes with packer assemblies, reconnecting and priming the existing pumps, flushing the wells, and ensuring the entire irrigation system is functioning properly. The estimated value of the contract is not to exceed $11,940, and the contract term will begin no later than August 16, 2024 and end on October 18, 2024, with the contractor expected to complete the work by September 27, 2024. Bid submissions must include applicable licenses and certifications, signed non-collusion and tax compliance forms, and evidence of meeting prevailing wage and OSHA training standards. Payment will be made upon completion of the work and submission of an invoice with certified payroll.

The contract will be awarded to the responsible and eligible bidder offering the lowest total price, provided the bid is reasonable and in the best interest of the Town of Dunstable. There are no set-aside designations or restrictions on the types of organizations that can respond. The prevailing wage rates provided in the attached schedule must be adhered to throughout the project duration, with annual updates required for multi-year contracts. Contractors are responsible for submitting weekly payroll reports and complying with all applicable state laws and regulations governing prevailing wages on public construction projects.

Opportunity text

Mobilize site and disconnect existing pump. Remove the existing well. Install a new stainless steel well screen and 2 inch pipe, and packer assembly. Reconnect and prime existing pump. Flush well and put into service. Ensure system is online, with all 7 wells and pumps functioning properly and servicing the irrigation system adequately.