Repair Storm Drain at Red Oak

Closed State & local contract opportunity Posted

Solicitation number
RFB FY23 #462
State
Iowa
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidopportunities.iowa.gov. Updated .

About this opportunity

The Iowa Department of Transportation (DOT) is seeking competitive bids from licensed plumbing contractors to repair a storm drain east of the IDOT Red Oak location. The scope of work includes the installation of approximately 200 feet of 8-inch PVC storm line pipe and fittings, as well as the supply and installation of a new fire hydrant on the south side of the dig site. The contractor will be responsible for all materials, labor, and equipment necessary to complete the work, which must be coordinated with the DOT to minimize disruption to their operations. The work must adhere to OSHA standards for shoring, open trenches, and safety, and all work must be completed during normal business hours, with after-hours work available upon prior approval. The contractor will also be responsible for disposing of all demo and debris off-site.

The contract is open to all qualified plumbing contractors, and there are no set-aside designations or restrictions on the types of organizations that can respond. The DOT has not provided any information about incumbent vendors or current contractors, nor any details on existing infrastructure or technology that may require integration. The DOT has not disclosed a budget range or anticipated award value for this contract.

Opportunity text

The Iowa DOT is seeking competitive bids for an Iowa licensed Plumbing contractor to provide all materials, labor and equipment necessary for the repair of a storm drain east of the IDOT Red Oak location as per the scope of work document on the Attachment tab. Work to include installation of approximately 200' of 8" PVC storm line pipe and fittings. Existing piping is concrete on south and PVC on the north. Contractor to also supply and install a new fire hydrant on the south side of dig site (see site map on the Attachment tab). All work to be coordinated with DOT to phase work where possible to minimize disruption to DOT functions. See Line Item Tab and Attachment Tab for details. OSHA: Contractor to follow all OSHA standards for shoring, open trenches, safety of area. Locates to be done prior to work starting, private lines will be done by DOT. All work to be completed during normal business hours 6:30am-4:00pm Mon- Fri. After hours are available with prior approval. This includes demo and all materials and debris is to be disposed of off site.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity