Repair Building 510 HVAC
Closed State & local contract opportunity Posted
- Solicitation number
- FA670326Q0002
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The 94th Airlift Wing at Dobbins Air Reserve Base, Georgia is requesting sealed bids for HVAC reconfiguration, DDC controls replacement, and mold-damaged drywall restoration on Building 510 under IFB FA670326Q0002, with bids due August 13, 2026 at 2:00 p.m. EST. This is a 100% Total Small Business Set-Aside contract under NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors), restricting bidding to small businesses with annual receipts not exceeding $19 million.
The scope includes reconfiguring HVAC systems and Direct Digital Control (DDC) systems throughout Building 510, replacing mold-damaged drywall, and moving and storing all building contents. All work must comply with local, state, and federal codes including Department of Air Force Requirements (DAFMAN and DAFI), UFC-430-01FA, the Dobbins Design Guide, and Dobbins' specifications 101, 1560, 1330. The contractor must commence work within 10 calendar days of notice to proceed and complete all work within 90 calendar days.
The estimated contract value is between $100,000 and $250,000 as a firm fixed-price award. Performance and payment bonds are required within 10 calendar days of award. A mandatory site visit is scheduled for July 23, 2026 at 9:00 a.m. EST at Building 812, 1538 Atlantic Avenue, Dobbins ARB, which requires advance registration and security clearance. The government contemplates making award by October 19, 2026. Offerors must be registered in SAM at bid submission and contractors must register with the Wide Area WorkFlow (WAWF) system for electronic payment. Monthly progress payments are subject to a maximum 10% retainage until satisfactory progress is demonstrated. Bids are submitted electronically to Kevin Song and Kenneth Jacob.
Opportunity text
238220 - Plumbing, Heating, and Air-Conditioning Contractors. At Building 510, the Contractor will reconfigure the HVAC and DDC Controls throughout and replace mold damaged drywall. Contractor is responsible for moving and storing all contents of the building. All work performed must meet local, state, and federal codes including but not limited to all applicable Department of Air Force Requirements (DAFMAN and DAFI), UFC-430-01FA, Dobbins Design Guide and Dobbins' specifications 101, 1560, 1330 and the United Facilities Criteria's (UFC).
Files
| File | Type | Posted |
|---|---|---|
| Solicitation_-_FA670326Q0002_4.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity