About this opportunity

Troy Borough, Pennsylvania is seeking bids for bridge replacement of structures carrying Redington Avenue and Railroad Street over West Branch Sugar Creek, along with water main relocations, bridge approach paving, guiderail installation, and sidewalk replacement, with bids due November 5, 2026 at 11:00 a.m. The project is federally funded under Pennsylvania Department of Transportation oversight and requires prequalification of bidders; no pre-bid meeting is scheduled.

The scope encompasses approximately 300 linear feet of work spanning from approximately 0.03 miles west of the SR14 and Redington Avenue intersection to approximately 0.08 miles east of the SR14 and Railroad Street intersection in Troy Borough, Bradford County. Work includes clearing and grubbing, excavation, pipe culverts, asphalt paving, concrete work, guide rail installation, bridge structure construction (comprising 48 percent of total contract value), temporary stream bypass systems, traffic control, and miscellaneous materials and services. Construction materials and specifications are detailed in the bid package for asphalt mixtures, concrete work, bridge components, and erosion and sediment control.

The estimated contract value is $2.5 million to $5 million. The project is a federal-aid project on a non-NHS route with a 0 percent DBE requirement and prevailing wage rates applicable. Structure work accounts for 48 percent of the total contract value. The anticipated Notice to Proceed is January 4, 2027, with required completion by October 3, 2028. Troy Borough serves as the local sponsor and project owner; the Commonwealth opens bids and awards the contract in the municipality's name. Payment will be made by Troy Borough following the locally-sponsored project payment process, with the Department submitting federal reimbursement claims to the Federal Highway Administration.

Opportunity text

The description and location of the project are as follows: Bridge replacement of an existing structure carrying Redington Avenue over West Branch Sugar Creek, bridge replacement of an existing structure carrying Railroad Street over West Branch Sugar Creek, water main relocation under Railroad Street, water main & sanitary sewer relocations under Redington Avenue, bridge approach paving, guiderail, sidewalk replacement, and other related work within an overall length of 300 linear feet (0.057 miles) as indicated on the approved drawings included in the bid package for the local bridge replacement for Redington Avenue & Railroad Street, approximately 0.03 miles west of the intersection of SR14 and Redington Ave to approximately 0.08 miles east of the intersection of SR14 and Railroad Street, in Troy Borough, Bradford County.

Files

File Type Posted
845882padot5112.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors