Reconstruction of Paerdegat Pumping Station
Open State & local contract opportunity Posted
- Solicitation number
- 2140578
- State
- New York
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Kristen Gaeta kgaeta@perfettocontracting.com (718) 858-8600
Updated .
About this opportunity
The New York City Department of Environmental Protection (NYCDEP), Bureau of Wastewater Treatment, is procuring the reconstruction of the Paerdegat Pumping Station under contract language PS-DES-5, with responses due December 16, 2026. The source posted November 6, 2026, and directs interested firms to the Bid Coordinator for access to the project documents.
The station at 6002 Flatlands Avenue in Brooklyn, Kings County, conveys flow to the Coney Island Wastewater Resource Recovery Facility. Built in 1932 with a 1995 upgrade, it has a designed capacity of 57 million gallons per day (MGD) in wet weather and 22.8 MGD in dry weather. The state-of-good-repair work targets compliance with NYCDEP standard operating procedures and design guidelines and spans several disciplines. Required work includes replacing pumps and the crane electrification system, installing a wet well elevation monitoring system, and replacing mechanical, HVAC, electrical, and instrumentation and controls systems. Resiliency upgrades include a permanent emergency fuel generator and fuel storage, plus two new influent chambers for an emergency bypass system. Civil and structural scope covers rehabilitating the wet well, reconstructing floors, walls, and ceilings, replacing clay tile and membrane roofing, and replacing facade walls, windows, floors, and the brick fence. The force main is to be replaced, a new parallel force main installed, and the spillway extended. Additional items include gate wall thimble replacement, bathroom plumbing and fixtures, remote monitoring cameras, relocation of the station identification sign, and replacement of a vintage wood gate.
Opportunity text
Paerdegat pumping station is located in Brooklyn, New York at 6002 Flatlands Ave, Brooklyn, New York that flows to the Coney Island Wastewater Resource Recovery Facility. The Pumping Station was constructed in 1932 with an upgrade completed in 1995. The station currently has a designed flow capacity of 57 million gallons per day (MGD) wet weather flow and 22.8 MGD dry weather flow. The existing station is in need of State of Good Repair (SOGR) upgrades in order to improve compliance with DEP's SOP's and design guidelines. Specifically, areas needing SOGR improvements include replacing existing pumps, placing wet well elevation monitoring system, new mechanical, HVAC, electrical, I & C systems, resiliency upgrades, provide permanent emergency fuel generator and fuel storage, replace crane electrification system, rehab wet well structure, reconstruction of floors, walls, and ceilings, replace clay tile and membrane roofing, replace building façade walls, windows, floors, and brick fence, replace plumbing and fixtures in bathroom, replace existing force main, install new parallel force main, extend spillway, replace the gate wall thimbles, constructing two influent chambers for emergency bypass system, install cameras for remote monitoring, relocation of station identification sign, and replace of vintage wood gate. For the purposes of this report and for internal NYCDEP coordination, all references to the pumping station will refer to the Paerdegat pumping station to be consistent with the PS-DES-5 contract language. Paerdegat is owned and operated by the New York City Department of Environmental Protection (NYCDEP) Bureau of Wastewater Treatment (BWT) NOTE: Please reach out to the Bid Coordinator for access to the project documents
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity