Rebuild 30-Inch M&H Check Valve - Tar River Dam
Closed State & local contract opportunity Posted
- Solicitation number
- QUO-070726FD
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Fantashia Dickens fantashia.dickens@rockymountnc.gov (252) 972-1352
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Rocky Mount, North Carolina, Engineering & Public Works Department is requesting quotations for the rebuild of a 30-inch M&H check valve for the Tar River Reservoir Dam Raw Water Intake, with quotes due July 22, 2026 at 2:00 p.m. This is an informal service procurement under $30,000.
Qualified fabricators must demonstrate experience rebuilding large-diameter check valves of 24 inches or greater for municipal or public-sector water utilities and hold applicable licensing and qualifications for machining, fabrication, and coating work. Respondents must provide references for similar completed projects.
The scope requires fabrication and machining of a new valve shaft, two bronze body bushings, a body seat ring, gland bushings, and keys; extraction of old bolts from the swing seat; machining the swing seat flat and drilling new bolt holes; provision of a new swing seat; machining and removal of old set screws in the armature; reassembly and coating of the rebuilt valve; and delivery to the Tar River Reservoir Water Treatment Plant at 4489 Leaston Road, Rocky Mount, North Carolina. The valve has been inspected by Charles R. Underwood Inc. and determined suitable for rebuilding rather than replacement. Work must be completed within ninety calendar days of contract award. The valve is available for viewing by appointment at the CRU facility at 2000 Boone Trail Road, Sanford, North Carolina, by contacting James Patterson at (919) 895-8306.
Quotes must include itemized pricing for labor, parts, materials, and equipment on a lump-sum or not-to-exceed basis, along with estimated lead time, proposed delivery date, confirmation of licensing and qualifications, and any exceptions or assumptions to scope. The City reserves the right to reject any or all quotes and will award to the lowest responsive, responsible vendor or in the best interest of the City. Direct questions to Fantashia.dickens@rockymountnc.gov.
Opportunity text
The City's Engineering & Public Works Department is requesting a formal quote from qualified, licensed fabricators to rebuild a 30-inch M & H check valve for the Tar River Reservoir Dam Raw Water Intake. The valve failed, causing water to leak backward through the piping. It was removed, disassembled, and inspected by Charles R. Underwood Inc. (CRU) and was determined to be in good condition for rebuilding rather than replacement. At a minimum, the selected Fabricator shall perform the following: Provide or fabricate and machine a new valve shaft Provide or fabricate and machine (2) new bronze body bushings Machine and sleeve the valve body lid Provide or fabricate and machine a new body seat ring Extract old bolts from the swing seat Machine swing seat flat and drill new bolt holes Provide or fabricate and machine a new swing seat Provide or fabricate and machine new gland bushings Fabricate and provide new keys Machine and remove old set screws in the armature Reassemble and coat the rebuilt valve Deliver the rebuilt valve to the Tar River Reservoir Water Treatment Plant, 4489 Leaston Rd., Rocky Mount, NC 27803 (City staff will offload using a City forklift)
Files
| File | Type | Posted |
|---|---|---|
| Rebuild 30-Inch M_H Check Valve - Tar River Water Supply Reservoir Dam.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity