REBID Port Orchard Marina Breakwater Replacement

Open State & local contract opportunity Posted

Solicitation number
03-15-0224-R
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Port of Bremerton is soliciting bids under rebid Invitation for Bid 03-15-0224-R for replacement of the breakwater at the Port Orchard Marina in Kitsap County, Washington. Intent to bid is due November 23, 2026 at 7:00 a.m. PST, and bids are due November 24, 2026. The source identifies no set-aside, preference program, or eligibility restriction.

The project includes new north and east breakwaters that may include approach floats, a new gangway, and demolition of existing structures and utilities. The breakwater, approach floats, and gangways are performance-specified, so the fabricator completes the final design, while the float anchoring system and float utilities are fully designed. Utility work covers dock water systems, dock fire systems, a sewer forcemain, and electrical. Upland work includes temporary erosion and sediment control, protection of existing utilities, and site restoration, including paving and landscaping. Project mitigation may include demolition of two timber piers within one mile of the site.

The source does not describe a contract value, term, or evaluation criteria, and the file summary lists the solicitation as a rebid of a prior procurement. The Invitation for Bid file is 31 MB and was posted October 27, 2026.

Opportunity text

Intent to bid due Nov 23rd 2026, 7:00 AM PST. The Port of Bremerton is seeking bids for a breakwater replacement project at the Port Orchard Marina. This project will include new north and east breakwaters, and may include approach floats, a new gangway, and demolition of the existing structures and utilities. The breakwater, approach floats, and gangways are performance specified for the fabricator's final design. The anchoring system for the floats is fully designed as well as the float utilities. Utility infrastructure includes dock water systems, dock fire systems, sewer forcemain, and electrical. The upland utility work includes temporary erosion and sediment control (TESC); existing utility protection, and site restoration, including paving and landscaping. The project mitigation components may include the demolition of two timber piers located within one mile of the site.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors