REBID Meridian Play Area Renovation and ADA Meridian RR Design
Closed State & local contract opportunity Posted
- Solicitation number
- PW#2025-037 (RE-BID)
- State
- Washington
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Gina Owens gina.owens@seattle.gov (206) 684-7251
- Fuadi Said fuadi.said@seattle.gov (206) 760-4044
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Seattle Department of Finance and Administrative Services, on behalf of the Department of Parks and Recreation, is requesting bids for renovation and ADA compliance improvements to Meridian Play Area under a rebid, with bids due September 2, 2026 at 2:00 PM. The project is subject to Washington State prevailing wage requirements and mandates an Inclusion Plan targeting 15 percent WMBE utilization based on past playground renovation project performance.
The scope includes replacement of play equipment, new site furniture, landscape improvements, accessible restroom renovation, and accessible connections to the northeast corner of Good Shepherd center. The project is located at 4920 Meridian Avenue North, Seattle, Washington 98103. Two optional alternates are offered: Alternate 1 covers sidewalk paving and replacement in lieu of repair, and Alternate 2 combines engineered wood fiber play surfacing with poured-in-place surfacing and cast-in-place concrete slab underlay.
The A/E estimate for the base bid is $940,347, with Alternate 1 estimated at $82,250 and Alternate 2 at $392,728. The contract is structured as lump sum with a mandatory Substantially Complete deadline of 100 working days from Notice to Proceed and a Physically Complete deadline of 115 working days. Liquidated damages are assessed at $1,000 per working day for failure to achieve Substantial Completion. A bid guaranty equal to five percent of the maximum bid amount is required.
Funding sources include REET II Capital Fund, Seattle Park District Fund, and General Fund. Questions are due by close of business August 26, 2026. No pre-bid site inspection meeting is scheduled. Apparent low bidders must demonstrate compliance with City business licensing, equal benefits requirements, labor standards, and social equity provisions before award.
Opportunity text
This project will replace the play area, located in Meridian Park. Renovation includes new play equipment, accessible access to all; site furniture, landscape and updated accessible restroom. This project includes two alternates: Alternate. 1 - Sidewalk paving and replacement in lieu of repair. Sidewalk extends from new. Accessible connection to northeast corner of Good Shepherd center will be demolished and installed as new sidewalk, rather than repaired. Alternate. 2 - EWF in combination with PIP Surfacing. A portion of the EWF Play surfacing will be replaced with Poured-in-Place surfacing and cast in place concrete slab underlay.
Files
| File | Type | Posted |
|---|---|---|
| PW2025-037_(RE-BID)_Meridian_PA_RR_100CD_Manual_-_signed.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity