Rebid Hard Labor Creek Reservoir Apalachee River Intake
Closed State & local contract opportunity Posted
- Solicitation number
- PE-99658-NONST-2026-000000005
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 95121810 Irrigation and flood control waterworks
- 72141511 Digging services
- 95121642 Sewage pumping station
- 72121505 Waste water and sewage treatment plant construction service
- 72141124 Pipe laying service
- 95121640 Pipeline
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 72101512 Hoist construction service
Show all 19
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 95121643 Sewage outfall
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- Point of contact
-
- Natalie Pifer 861np@ppi.us (770) 338-8120
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Walton County Water & Sewerage Authority is conducting a sealed bid procurement for the Rebid Hard Labor Creek Reservoir Apalachee River Intake project located in Walton County, Georgia. This construction project requires bidders to furnish all materials, labor, tools, equipment, and miscellaneous items necessary to complete the work. The project scope includes construction of an in-river channel to the intake structure, a cast-in-place concrete intake structure, an entrance road, grading, security fencing, landscaping, and associated work as detailed in the contract documents. Sealed bids must be submitted to the Walton County Water & Sewerage Authority at 2171 Highway 81, Loganville, GA 30052 by 2:00 p.m. local time on Thursday, April 23, 2026, with public opening and reading of bids at that time and location. The contract documents, specifications, and construction drawings are available from Precision Planning, Inc. upon email request to Natalie Pifer at 861np@ppi.us. The project timeline requires completion of all work within 365 consecutive calendar days from the date of the written Notice to Proceed issued by the Owner, and award of the project will be made within 60 days of the bid opening.
The procurement documents provided do not specify any set-aside designations, restrictions on bidder types, disadvantaged enterprise requirements, incumbent vendors, or current contractors. Additionally, no information regarding budget ranges or possible award values is included in the available procurement materials. Interested contractors should contact Precision Planning, Inc. directly to obtain complete contract documents and specifications that may contain additional qualifications, evaluation criteria, or project cost information necessary for preparing a competitive bid response.
Opportunity text
REBID HARD LABOR CREEK RESERVOIR APALACHEE RIVER INTAKE Sealed bids will be received by the Walton County Water & Sewerage Authority for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the Rebid Hard Labor Creek Reservoir Apalachee River Intake in Walton County, GA. Bids will be received at the Walton County Water & Sewerage Authority, 2171 Highway 81, Loganville, GA 30052 until 2:00 p.m. local time on Thursday, April 23, 2026. Any bid received after said time and date of bid opening will not be considered by OWNER. Bids will be publicly opened and read aloud at this time and location. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. The Project consists of, but is not limited to the following major elements: Construction of an in-river channel to the intake structure, a cast-in-place concrete intake structure, an entrance road, grading, security fencing, landscaping, and additional associated work as specified and indicated in the contract documents. Time of completion for all work associated with Rebid Hard Labor Creek Reservoir Apalachee River Intake shall be THREE HUNDRED SIXTY-FIVE (365) consecutive calendar days of the date specified in a written ¿Notice to Proceed¿ from OWNER. Copies of Contract Documents, Specifications, and Construction Drawings may be obtained from Precision Planning, Inc. upon an email request for plans to Natalie Pifer 861np@ppi.us.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity