Re-Bid: Lift Station 119 Improvements

Closed State & local contract opportunity Posted

Solicitation number
ITB-09020
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

The City of Winter Haven, Florida is seeking bids for the "Re-Bid: Lift Station #119 Improvements" project. This project involves the construction of a new sanitary sewer lift station and the demolition of the existing lift station, including the control system. The new lift station will be a duplex system with two 12 HP pumps, an 8-foot diameter concrete wet well, and a 15-foot depth. The scope also includes the construction of a new 6-inch force main, 8-inch gravity sewer main, emergency bypass pump, control panel, telemetry, and data flow. Additionally, the project requires a retaining wall on the north and east sides of the lift station due to lake levels and ground elevation, as well as the installation of "Florida friendly" landscaping. Bids are due by 2:00 PM on June 18, 2024, with a public bid opening immediately following. The successful bidder must commence work within 20 days of the notice to proceed and complete the project within 180 calendar days, with liquidated damages of $1,000 per calendar day for any delays. Bidders must provide a list of at least three similar projects and certify they are not on any scrutinized company lists.

The City has not specified any set-aside designations or restrictions on the types of organizations that can respond. The City will be providing the Flygt pump package and bypass pump, and it is not clear if there is an incumbent vendor or current contractor. The City has not provided any information on the award value or budget range for this project.

Opportunity text

The project consists of construction of a sanitary sewer lift station and demolition of the existing LS 119, including control system. The new lift station will be located on a vacant lot on Lake Mirror adjacent to the existing lift station location that is now in the middle of the road. The new lift station will be a duplex with (2), -12 HP pumps system, 8 foot inside diameter concrete wet well with 8" wall thickness, and 15 feet deep - from well invert to top of lift station. The work also includes construction of a new 6" force main, connecting to existing 6" force main, gate valves, check valves and fittings, water service, new 8" gravity sewer main and emergency by-pass pump, Control Panel, Telemetry and Data Flow. Included in the project is a retaining wall on the North and East side of the Lift Station due to lake levels and ground elevation. The project will include determined tree removals, and the installation of "Florida friendly" landscaping covering the overall parcel outside of lift station limits.

Files

File Type Posted
ITB-24-25 ReBid - LS 119 Improvements.pdf PDF