Marion County, Oregon is requesting bids for Railroad Avenue Reconstruction in Mission CDP, with bids due July 14, 2026. The scope includes complete street reconstruction: removal of existing concrete, asphalt, curbs, and sidewalks; construction of a 32-foot-wide curb-to-curb asphaltic concrete street with new curbs, gutters, and full-depth AC paving; replacement of existing sidewalks; and construction of ADA-compliant ramps. Stormwater improvements include installation of 4 catch basins, 420 feet of storm drain piping, a 48-foot manhole, and a new 72-inch manhole with connection to the existing 42-inch storm drain. The project also involves replacement of portions of existing 36-inch drainage structures with two 30-inch pipes and associated rectangular concrete structures at two drainage crossings, plus streetlight replacement and relocation to meet national lighting standards.
The attached Bid Notice does not specify estimated contract value, contract term, incumbent contractor information, set-asides or preference programs, bonding requirements, pricing terms, evaluation criteria, pre-bid meeting dates, site visit opportunities, or question deadlines. Prospective bidders should contact Marion County directly to obtain the full bid package, technical specifications, contract conditions, addenda, and clarification on procurement timeline milestones.
Opportunity text
Project Description: The work consists of removal of existing concrete and asphalt paving, curbs and sidewalks from the deteriorated street. Construction of a 32-foot-wide curb to curb asphaltic concrete street including curb and gutter and full depth AC paving. Replacing existing sidewalks, and construction of ADA ramps. Stormwater improvements include 4 catch basins, and 420 feet of storm drain piping, 48' manhole and connection to the existing sidewalks 42" Storm Drain with new 72" manhole. Improvements to two (2) existing drainage crossings include replacement of a portion of the existing 36" with two (2) existing drainage crossings include replacement of a portion of the existing 36" with two (2) 30" including rectangular concrete structures. Streetlight replacement and relocation will be required for adequate lighting according to national standards.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-Railroad Avenue Reconstruction.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity