About this opportunity
The City of Fort Worth Water Department and Transportation and Public Works Department is requesting bids for water and sanitary sewer line replacements and pavement work under City Project No. 103434, with electronic bids due August 20, 2026 at 2:00 p.m. CST via the Procurement Portal and a pre-bid conference scheduled for August 11, 2026. The City has a 30% Small Business goal based on total bid amount, with small businesses required to be certified by qualifying agencies and located within five counties (Tarrant, Denton, Wise, Parker, and Johnson).
The scope includes approximately 3,280 linear feet of 24-inch water line by open cut, 130 LF of 42-inch casing by other than open cut, 6,408 LF of 8-inch water line, 8 gate valves (24-inch with vault) and 24 gate valves (8-inch), 99 water service connections, 6,969 LF of 8-inch sewer pipe by open cut, 43 four-inch sewer manholes, 105 sewer service connections, and pavement pulverization totaling 34,778 square yards (13,672 SY of 11-inch depth with 3-inch asphalt Type D and 21,106 SY of 12-inch depth with 1.5-inch asphalt Superpave SP-D and 2.5-inch asphalt Type B). Contract completion is 420 calendar days from commencement. Liquidated damages are $650.00 per day for delays beyond the completion date.
Bidders must prequalify at least seven calendar days before bid opening for water transmission (24-inches and smaller), sanitary sewer collection systems (8-inches and smaller), sewer cured-in-place pipe (CIPP) (12-inches and smaller), auger boring (greater than 24-inch diameter casing), and asphalt paving construction/reconstruction (15,000 square yards and greater). Bid security of 5% of the maximum bid price in the form of a bid bond is required. The contractor must perform at least 35% of contract work with its own organization unless otherwise approved by the City. Nonresident bidders must comply with Texas Government Code Chapter 2252.
Opportunity text
The major work will consist of the following: 3,280 LF 24 Water Line by Open Cut. 130 LF 42 Casing by Other Than Open Cut. 144 LF 12 Water Line by Open Cut. 138 LF 10 Water Line by Open Cut. 6,408 LF 8 Water Line by Open Cut. 8 EA 24 Gate Valve w/ Vault. 24 EA 8 Gate Valve 99 EA Water Service. 6,969 LF 8 Sewer Pipe by Open Cut. 43 EA 4 Sewer Manhole 105 EA Sewer Service. 13,672 SY 11 Pavement Pulverization (3 Asphalt Type D). 21,106 SY 12 Pavement Pulverization (1.5" Asphalt Superpave SP-D & 2.5" Asphalt Type B.
Files
| File | Type | Posted |
|---|---|---|
| 103434-2020WSM-O Contract Documents.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline