Purdom Tank One Recoating

Closed State & local contract opportunity Posted

Solicitation number
IFB-094-26-RM
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from talgov.bonfirehub.com. Updated .

About this opportunity

The City of Tallahassee is soliciting bids for complete recoating of Tank No. 1 at Purdom Generating Station, with bids due August 20, 2026 and a mandatory pre-bid and site visit on July 30 at 9:30 a.m. EST at 667 Port Leon Drive, St. Marks, Florida.

Tank No. 1 is a 60-foot-diameter, 42-foot-height carbon steel storage tank with existing lead-containing exterior coating that requires full removal under containment, interior and exterior surface preparation, and recoating to address rusting and peeling on the top and sides. The scope includes chime repairs and relabeling; all piping penetrations, manways, external stairway, vent, and capped nozzle penetrations on the fixed roof and tank shell must be included in the coating system. Recoating of piping shall extend to the first encountered flange gasket, except for overflow piping, which must be fully coated. The contractor must follow applicable codes, standards, and coating/primer manufacturer-recommended procedures; omissions or deficiencies in the specification do not relieve the contractor from meeting or exceeding these requirements. Work is performed at Purdom Generating Station in St. Marks, Florida.

Opportunity text

This specification establishes technical requirements and guidelines for the complete removal of the existing lead‑containing exterior coating system under full containment, along with interior and exterior surface preparation, coating application, inspection, and project closeout for Tank No. 1 located at the Purdom Generating Station. Work also includes necessary chime repairs and coating. The City of Tallahassee is soliciting bids to complete coating of Tank No. 1 to address rusting and peeling that has occurred on both the top and sides of the tank. Work includes preparation of the tank and recoating as per primer/coating manufacturer recommendation, to include chime repairs as needed and relabeling of tank. The City has evidence that the primer/coating currently on the tank contains lead. Tank No. 1 is a carbon steel storage tank measuring 60 feet in diameter and 42 feet in height. The fixed roof includes a vent, manway, and several capped nozzle penetrations. The tank shell includes piping penetrations, a manway, and an external stairway. All such features are to be included in the coating scope. For piping penetrations, recoating shall extend outward from the tank to the first encountered flange gasket, except for the overflow piping, which shall be fully coated. It is not the Owner's intent to specify all code and technical requirements with regard to recoating of the tank or containment, nor to set forth those requirements covered by applicable codes and standards. The Contractor shall provide a quality service and quality product which meets or exceeds relevant codes, standards, and coating/primer manufacturer recommended procedures and neither the omission nor the deficiency of any item in this Specification shall relieve the Contractor from this responsibility. Mandatory Pre-Bid and Site Visit July 30, 2026@9:30 EST Purdom Generating Station 667 Port Leon Drive St. Marks, Florida 32355