Pump Station Electrical Improvements

Closed State & local contract opportunity Posted

Solicitation number
BD-25-1463-TOOB1-TOOB0-120748
State
Massachusetts
Responses due

Opportunity facts

Points of contact

Opportunity details come from commbuys.com. Updated .

About this opportunity

The Town of Oak Bluffs in Massachusetts is seeking bids for a Pump Station Electrical Improvements project involving the construction of replacement control panels for two duplex pump stations, an OEM generator control panel, a master telemetry panel, and a valve control panel for an effluent disposal site. The contract, numbered 23MWIPOAKBLUFFSMVCOM, requires sealed bids to be submitted to the Oak Bluffs Wastewater Treatment Facility by October 9 at 1:00 p.m. A non-mandatory pre-bid conference is scheduled for October 1 at 10 a.m. Bidders must provide a bid security of 5% of their maximum bid price, which can be submitted as a certified check, bank money order, or bid bond. The project specifications, prepared by GHD Inc., outline a 240-calendar-day timeline for substantial completion and 270 days for final payment. Bidders must comply with both Massachusetts General Laws and Davis-Bacon Act wage requirements, and the successful contractor will be required to furnish 100% performance and payment bonds.

The procurement appears to be open to all qualified bidders, with no specific set-aside designations mentioned in the documentation. Bidding documents are available in electronic format on thumb drive at no charge, with paper copies obtainable for a refundable deposit of $350.00. The Town of Oak Bluffs reserves the right to waive informalities or reject any or all bids, and bidders must certify that their proposals have been prepared without collusion. While specific budget ranges are not explicitly stated, the complexity of the electrical improvements and control panel replacements suggests a significant infrastructure investment. The project covers jurisdictions in Dukes County and involves critical wastewater treatment infrastructure upgrades. Potential bidders should carefully review the complete bidding documents to understand the full scope of work, technical specifications, and compliance requirements for this electrical improvements project.

Opportunity text

The Work consists of the construction of replacement control panels for two duplex pump stations, an OEM generator control panel, a master telemetry panel, and a valve control panel for an effluent disposal site.

Files

File Type Posted
Commbuys Pump Station Electircal Improvements.pdf PDF