Pump Station 2 Improvements and Modernization
Open State & local contract opportunity Posted
- Solicitation number
- K-27-2502-DBB-3-C
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Ron McMinn rmcminn@sandiego.gov (858) 537-2500
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Jurisdictions San Diego County and San Diego City, California, are soliciting bids for the rehabilitation and modernization of Pump Station 2, with proposals due December 10, 2026. The opportunity was posted October 29, 2026.
The scope covers pumping systems rehabilitation, including replacement of all eight pumps and six motor controllers. Work includes variable frequency drives for Pumps 3 and 6, reduced-voltage soft starters for Pumps 1, 2, 7, and 8, and replacement of eight cone valves and eight actuators with associated discharge piping. The project also requires suction and discharge piping rehabilitation, a VFD room installation with HVAC and ventilation, and replacement of instrumentation and monitoring systems. Structural and civil repairs include Wet Wells 1 and 2, influent channel liner and concrete, discharge header systems, slab and pipe gallery joints, discharge valve supports 1 through 4, and some exterior building elements.
Opportunity text
Rehabilitate pumping systems, including replacement of all eight (8) pumps. Replace six (6) motor controllers, including installation of Variable Frequency Drives (VFDs) for Pumps 3 and 6 and reduced voltage soft starters for Pumps 1, 2, 7, and 8. Replace suction and discharge valves and appurtenances, including replacement of eight (8) cone valves and eight (8) actuators with associated discharge piping and appurtenances. Rehabilitate suction piping system, replace pump discharge piping. VFD room installation and modifications, HVAC and ventilation systems, and associated architectural elements required for equipment installation and operation. Replace instrumentation and monitoring systems. Repair liner and concrete in influent channels. Rehabilitate Wet Wells 1 and 2, including structural repairs. Repair discharge header systems. Seal open joints between slabs and pump station pipe gallery and repair discharge valve supports 1 through 4, and repair some exterior building elements.