About this opportunity
State Center Community College District is soliciting qualifications for Progressive Design Build Services to renovate Ratcliffe Stadium and replace the Field House, with qualifications due October 8, 2026 at 2:00 PM PDT. This is a Request for Qualifications phase only; shortlisted firms will advance to a subsequent Request for Proposal phase with a pre-bid meeting.
Interested firms must hold a California Class A or Class B license. The District will engage a single Progressive Design-Build Entity to deliver design, preconstruction, and construction services across two phases. Phase One encompasses design refinement, scope establishment, budget validation, and development of a Guaranteed Maximum Price (GMP) or alternative commercial terms under an open-book cost-transparency model. Phase Two (Construction Services) will be authorized only through an amendment following Phase One completion and District acceptance of the GMP. If the District does not accept the proposed GMP, it reserves the right to terminate the agreement for convenience, negotiate a revised GMP, or pursue alternative delivery methods, with the PDBE compensated only for Phase One services satisfactorily performed.
The scope includes structural steel, concrete foundations, framing, masonry, electrical, plumbing, HVAC, roofing, and finishing trades. The estimated project value is $70 million with lump-sum award type. Place of performance is Fresno County and Fremont City, California.
An online question-and-answer period closes August 26, 2026 at 2:00 PM PDT. No pre-bid meeting is held for the RFQ phase; shortlisted teams will participate in a pre-bid meeting during the RFP phase. Direct inquiries to Teresa Campagna Bryant, District Director of Procurement and Contracts, at teresa.campagna@scccd.edu.
Opportunity text
2 versions
Update #2 · Latest ·
The Board of Trustees of the California State University is requesting Statements of Qualifications (SOQ) from interested and qualified general contractors (Respondents) to provide Design-Build (DB), Collaborative (Progressive) Design-Build (CDB), and Construction Manager at Risk (CMAR) services the design, preconstruction, construction management, and/or construction of a portfolio of projects under a master enabling agreement. RFQ documents are available online and a link to the documents can be found on Planet Bids. Respondents shall register and log in to download the RFQ documents. If you have problems viewing the documents, contact David Sawyer, davidsawyer@mail.fresnostate.edu or 559-278-3962 for assistance. Respondents must be prequalified with the Trustees at least one day prior to the SOQ due date, or Trustees will not consider the Respondents SOQ submissions. All Respondents shall submit their prequalification applications online no less than ten (10) business days prior to the SOQ submittal due date above. To apply, go to http://www.calstate.edu/contractor-prequalification, and click on PlanetBids to register and log in. Each Respondents prequalification rating for the TO-CA MEA shall not be less $8,000,000. The State requires three percent Disabled Veteran Business Enterprise participation. This TO-CA MEA contains multiple public works projects, which are subject to prevailing wage rate laws. All contractors and all tiers of subcontractors bidding on this project shall currently be registered with the Department of Industrial Relations (DIR) to bid Public Works Projects, and maintain current this registration pursuant to Labor Code Section 1725.5. Please go to http://www.dir.ca.gov/Public-Works/PublicWorks.html for more information and to register. This project requires reporting and use of a skilled and trained workforce pursuant to PCC 2600. Proposer must sign and submit the "Skilled and Trained Workforce Agreement" as part of their Statement of Qualifications package to be considered responsive to this solicitation
Update #1 ·
Under the progressive design-build (PDB) approach, the District will engage a single Progressive Design-Build Entity (PDBE) to provide design, preconstruction, and construction services in two distinct phases. The process emphasizes early collaboration, open-book cost transparency, and shared risk during design development, followed by a negotiated Guaranteed Maximum Price (GMP) or other agreed-upon commercial terms prior to construction