Wakulla County is requesting qualifications from professional engineering firms to provide Phase 1 surveying, flood risk reduction analysis, engineering design, plans preparation, public notices, permitting coordination, and bid proposal preparation services for Wakulla Gardens stormwater infrastructure improvements under RFQ 2026-16, with proposals due September 1, 2026, and oral presentations scheduled for September 16–17. All work must comply with federal Hazard Mitigation Grant Program (HMGP) guidelines administered by the Florida Division of Emergency Management.

Phase 1 focuses on evaluation and development of flood risk reduction measures without construction; Phase 2, not part of this RFQ, will involve acquisition of approximately 16 parcels and construction of six stormwater retention basins designed to protect against 10-year storm events. The selected consultant must complete all Phase 1 activities by March 31, 2027, commencing 15 calendar days after the Notice of Award (anticipated October 20, 2026).

Compensation for Phase 1 is fixed at $70,842 on a cost-reimbursable basis. Phase 2 compensation is contingent upon successful Phase 1 completion, FEMA approval, and funding availability. The selected consultant must maintain Professional Liability Insurance of at least $1 million for design errors and omissions, continuing for two years after project completion, and must submit a Proposal Bond equal to 5% of the proposal amount. Respondents must maintain active Sam.gov registration and provide their Unique Entity Identifier at proposal submission.

The County will evaluate proposals on project approach, qualifications of firm and key staff, availability of dedicated staff, references on recent projects, and oral presentation performance. Written questions are due August 6, 2026. The County reserves the right to reject any or all proposals and award to one or multiple proposers.

Opportunity text

3 versions

Update #3 · Latest ·

The scope includes exterior restoration and water intrusion mitigation at Monticello High School; Jefferson County Building A. Work includes replacement of deteriorated exterior wood with kiln-dried after treatment (kdat) wood to match existing historic features; installation of watertight entrance thresholds and sill flashing; removal of nonhistoric entryway canopies and repair of associated wood and masonry damage; repair and installation of historic entrance doors; repair and waterproofing of exterior concrete staircases, landings, and basement entrance; and restoration of thirteen (13) windows and associated framing. Roof and drainage work includes slate repairs, liquid-applied gutter waterproofing, cleaning and repair of scuppers, leaderheads, gutters, and downspouts, and clearing the exterior stairwell drain and connected stormwater piping. Include associated preparation, priming, painting, and water testing to verify proper drainage and weathertight repairs. Additive alternate #1 provide a separate additive/deductive alternate for the use of azek in lieu of kdat at applicable wood-rot replacement locations, retaining kdat at structural members unless otherwise, detailed and approved.

Update #2 ·

Suwannee County (County) requests proposals for a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Emergency Operations Building project (Project) in Suwannee County, Florida. These services will be coordinated with an architectural and engineering consultant (the Design Professional) through the design and construction phases of the Project. The CMAR will be chosen to manage and complete the design of all required engineering, permitting, and construction administration of the new building.

Update #1 ·

Wakulla County (the County) is seeking Statements of Qualifications from qualified professional engineering firms (the Consultant) to provide surveying, flood risk reduction analysis, engineering, design, plans preparation, public notices, permitting coordination, and bid proposal preparation services for Phase 1 for RFQ 2026-16 Rebid Professional Services for Wakulla Gardens Stormwater Infrastructure.