PRC Airport Hangar Development Phase 1
Open State & local contract opportunity Posted
- Solicitation number
- 2026-NIBCONST-681
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Jaimie Sventek contracts@prescott-az.gov (928) 777-1100
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Prescott, Arizona, through Prescott Regional Airport (PRC), is soliciting bids for Phase 1 of an Executive Hangar Development, with inquiries due December 1, 2026 and bids due December 10, 2026. Bidders must be licensed Arizona A-General Engineering contractors, and each bid must include a proposal guarantee of no less than 10% of the total bid price.
The project is a 4-unit, 16,315-square-foot hangar built as a pre-engineered steel building to architectural performance specifications, expressly not tied to a single-source steel manufacturer. Interior scope includes water fire suppression, interior floor drains, a 1,500-gallon oil and water separator, toilet rooms, mezzanines, lighting, electrical distribution with four tenant meters, HVLS fans, and fire alarm systems. Civil scope covers grading, drainage, utilities, an aircraft taxi lane pavement extension, security fencing, and a concrete aircraft wash rack with water and drainage improvements.
Funding combines Federal Aviation Administration Airport Entitlements, Infrastructure Investment and Jobs Act grants, Arizona Department of Transportation funding, and City of Prescott matching funds. The contract term is 262 calendar days from Notice to Proceed, with anticipated completion the week of September 27, 2027. Place of performance is Yavapai County, Arizona.
Required insurance includes general liability with a $3.0 million general aggregate, business automobile liability with a $1.0 million combined single limit, and statutory workers' compensation. The City of Prescott must be named additional insured on all liability policies.
Bids open December 10, 2026 at 2:00 p.m. through the OpenGov Procurement Portal, and bids remain valid for 90 days after opening. Inquiries must be submitted through OpenGov by 5:00 p.m. on December 1, 2026. Anticipated award is January 5, 2027, with a pre-construction meeting the week of January 11 and Notice to Proceed the week of January 18, 2027. Protests must be filed with the City Clerk's Office within ten days of award announcement.
Opportunity text
The Prescott Regional Airport (PRC) is soliciting for construction of an Executive Hangar Development. The project will consist of a 4-unit, 16,315 square foot hangar development project. The hangar shall be a pre-engineered steel building. The pre-engineered steel building will be based upon architectural performance specifications and not a single-source steel manufacturer. The hangar shall have a water fire suppression system along with interior floor drains with 1,500 gallon oil and water separator. Civil site improvements consist of grading, drainage, utilities, aircraft taxi lane pavement and security fencing. Also included is a concrete aircraft wash rack with water and drainage improvements.
Files
| File | Type | Posted |
|---|---|---|
| PRC_Airport_Hangar_Development_Phase_1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity