Pool Dehumidification System Replacement
- The City of Meriden Parks & Recreation Department is requesting bids for refurbishment of the Pool Filtration System at Hubbard Park, 999 West Main Street, Meriden, Connecticut, under Invitation to Bid B026-33R, with bids due June 18, 2026 at 11:00 a.m. A local preference provision allows City-based businesses bidding not more than 10% above the lowest bid to accept the award at the low bid amount. Prevailing wages are required under Connecticut General Statutes Section 31-53; contractors...
- The Commonwealth of Virginia Department of Conservation and Recreation is soliciting bids for HVAC replacement and maintenance at the Dutton House in Kiptopeke State Park, Northampton County, with electronic bids due July 6, 2026 at 10:00 a.m. This is a Small Business Priority Set Aside, restricting eligibility to qualifying small businesses. Bidders must hold a Virginia Department of Professional and Occupational Regulation contractor license and submit the license number and class with the...
- The Town of Vienna, Virginia is requesting bids on the renovation of six restrooms across three floors at Vienna Town Hall under IFB 26-14, with bids due July 14, 2026 at 2:00 PM and a non-mandatory pre-proposal meeting on June 30 at 10:00 AM. The scope includes demolition and replacement of all fixtures and finishes—tile flooring, wall treatments, lighting, plumbing fixtures, and mechanical and electrical systems—maintaining existing configurations and ADA accessibility. Work encompasses...
- The Virginia Department of Transportation is requesting bids for in-kind replacement of four rooftop HVAC units at the VDOT Lockwood Building in Mechanicsville, Virginia (Halifax County), with bids due July 16, 2026. The scope covers replacement of four RTUs (RTU 1–4) serving the 154,877-square-foot, four-story building at 9120 Lockwood Boulevard. Work includes removal and disposal of existing units; installation of new Annexair rooftop units with DX cooling coils, supply and return air...
- The Commonwealth of Virginia Department of Environmental Quality is soliciting sealed bids for air monitoring equipment serving data center monitoring sites in Loudoun and Prince William counties under IFB #26-06-CLH/121752, with bids due June 16, 2026 at 3:00 p.m. EST. This is a spot purchase contract with one qualified source; bidders must offer all specified equipment to be considered responsive. The scope comprises specialized air quality monitoring instrumentation: a dynamic dilution...
- The Norfolk Redevelopment and Housing Authority (NRHA) is requesting sealed bids for repairs to three burn units damaged by fire, with bids due July 9, 2026 at 3:00 PM through the NRHA Bonfire Interactive Portal. A mandatory pre-bid conference and site visits are scheduled for June 25, 2026 at 10:00 AM at Hunter Square Midrise, 825 Golf Street, Norfolk, Virginia, with sequential visits to all three damaged units. The scope covers comprehensive restoration of units at 906 St. Paul Street and...
The City of Hopewell, Virginia is requesting sealed bids for removal and replacement of the dehumidification system at the Community Center Aquatic Facility under IFB 15-26, with bids due July 9, 2026 at 11:00 a.m. EST and a mandatory pre-bid conference and site visit on July 1, 2026 at 11:00 a.m. EST. Bidders must hold a current Class A Contractor's license from the Commonwealth of Virginia Board of Contractors and appropriate specialty licenses for electrical work. Contractors must demonstrate a minimum of five consecutive years providing similar dehumidification system services and provide three project references of similar scope completed within fifteen years. A qualified master electrician must be employed for all electrical work. The scope encompasses demolition and removal of the existing natatorium dehumidification equipment at the six-lane, 25-meter indoor pool facility (constructed 1982, approximately 225,000 gallons capacity, serving approximately 2,300 users monthly), installation of new dehumidification systems designed for natatorium use, ductwork modifications and air distribution, structural and building modifications, electrical work and utility coordination, controls integration, testing and commissioning, and permitting. All work must be submitted as a lump-sum fixed-price bid covering labor, materials, equipment, tools, supervision, permits, testing, inspections, transportation, delivery, and administrative costs. A three-year warranty on all work and materials is required. Contractors must maintain comprehensive liability insurance from companies authorized to do business in Virginia. The anticipated timeline runs from contract execution in July 2026, notice to proceed in August 2026, construction start in September 2026, substantial completion by March 2027, and final completion by April 2027. Bid review and responsiveness determination occur July 13–15, 2026, with notice of intent to award by July 20, 2026. Written questions are due June 29, 2026 at 5:00 p.m. EST, with responses posted by June 30, 2026. The contract will be awarded to the lowest responsive and responsible bidder under the Virginia Public Procurement Act. Contract awards may be used cooperatively by other Virginia public bodies and governmental agencies with contractor consent. Bids may not be withdrawn for ninety days following the opening date except as permitted under the Virginia Public Procurement Act.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Plans - Pool Dehumidification IFB 15-26.pdf | 996KB | 6/24/26 | ||
IFB 15-26 Pool Dehumidification System Replacement.pdf | 839KB | 6/24/26 |