PNF Airstrip Maintenance

Closed State & local contract opportunity Posted

Solicitation number
1240LR26Q0006
State
Idaho
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Krassel Ranger District of the Payette National Forest is requesting bids and work proposals for annual maintenance to grade and resurface four FAA-designated airstrips within the Frank Church River of No Return Wilderness, with proposals due May 29, 2026 at 2:00 p.m. Mountain Time. This is a total small business set-aside under NAICS 561730 (Landscaping Services).

The four airstrips are Chamberlain, Cold Meadows, Cabin Creek, and Soldier Bar. The contractor must complete maintenance on a minimum of one airstrip annually over a five-year contract period (June 14, 2026 through June 15, 2031), with work distributed evenly across the four strips. Proposals must include detailed cost estimates and project timelines reflecting the level of maintenance, travel, labor, and time commitment required for each airstrip.

An additional $22,000 funding increase has been added to the requisition for the specified work period. Invoices are submitted to the Forest Supervisor's office at 324 25th Street, Ogden, Utah 84401-2310. Contact Andrea Marks at 208-481-7791 for questions. The solicitation is designated as a rated order under the Defense Priorities and Allocations System (DPAS) and incorporates FAR provisions 52.212-1, 52.212-3, 52.212-4, and 52.212-5 by reference.

Opportunity text

Total Small Business Set-Aside, 561730 - Landscaping Services. The Krassel Ranger District of the Payette National Forest is requesting bids and work proposals with a cost estimate and timeline from contractors for work to complete annual maintenance to grade and resurface Payette National Forest Airstrips within the Frank Church River of No Return Wilderness. There are 4 airstrips: Chamberlain, Cold Meadows, Cabin Creek and Soldier Bar. These strips are FAA designated and are labeled on Forest maps and Aeronautical charts. Minimum and Maximum The objective is to annually complete maintenance on a minimum of 1 airstrip each year over a five-year period.

Files

File Type Posted
1240LR26Q0006.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity