Phase 2 Aquatic Center - John Chavis Memorial Park
Closed State & local contract opportunity Posted
- Solicitation number
- 274-FY2027-CM-P06
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Kevin Roberts kevin.roberts@raleighnc.gov (919) 754-6100
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
City of Raleigh, North Carolina's Engineering Services Department is soliciting sealed bids for construction of the Phase 2 Aquatic Center at John Chavis Memorial Park, with bids due November 10, 2026 at 2:00 PM. Bidders must be prequalified and licensed to perform work under North Carolina General Statute Chapter 87, and sealed bids are limited to prequalified subcontractors.
The project is a new two-story aquatic center on approximately five acres beside the existing John Chavis Community Center and historic Allan Herschell Carousel. The building includes approximately 25,000 square feet of mixed-use interior space, including a 3,160 square foot competition/lap pool and a 1,400 square foot therapy pool. The outdoor aquatic area covers approximately 10,300 square feet and includes a 4,600 square foot activity pool with a lazy river, vortex, water recreation area, and two-story waterslide. Related work includes site parking reconfiguration, Heritage Plaza upgrades with a historically inspired public art installation, stone bridge repairs, and new connections to the South Park Heritage Trail. The facility will be fully sprinklered and steel-framed, requiring complete civil, structural, architectural, mechanical, electrical, plumbing, fire protection, and site utility systems.
The project uses Construction Manager at Risk delivery, with Barnhill Building Group, LLC and Holt Brothers Construction, LLC as joint venture partners. Each bid must include bid security of five percent of the bid amount. Award will go to the lowest responsible and responsive bidder, considering quality, performance, and time specified in the bid form. The City reserves the right to waive any informality or reject any or all bids. Bids will be publicly opened and read aloud at the Neuse River Room, Walnut Creek Wetland Park, 950 Peterson Street, Raleigh, NC 27610. Bid document and project questions route to Barnhill Building Group at 919.480.4078, dhale@barnhillcontracting.com, jharris@holtbrothersinc.com, or marc.marotta@barnhillcontracting.com.
Opportunity text
This project proposes the construction of a new two-story aquatic center as part of Phase 2 of the John Chavis Memorial Park Master Plan. The Phase 2 Aquatic Center project, located alongside the existing John Chavis Community Center and the historic Allan Herschell Carousel, includes approximately five acres of site development and construction of a new indoor/outdoor aquatic facility and Heritage Plaza. The aquatic center will include approximately 25,000 SF of mixed-use interior space consisting of assembly areas, locker rooms, administrative offices, mechanical and equipment rooms, storage, and other support spaces. Indoor aquatic amenities include a 3,160 SF competition/lap pool and a 1,400 SF therapy pool. The outdoor aquatic area will encompass approximately 10,300 SF and feature a 4,600 SF activity pool with a lazy river, vortex, water recreation area, and a two-story waterslide. The building's architectural design is highlighted by an overhead oval-shaped perforated metal "crown" that distinguishes the facility's roofline and references the park's historic carousel. The project also includes reconfiguration of site parking, upgrades to the Heritage Plaza with a historically inspired public art installation, repairs to the existing stone bridge, and new connections to the South Park Heritage Trail. The aquatic center will be a fully sprinklered, steel-framed structure with mixed assembly and business occupancies. The scope of work includes complete civil, structural, architectural, mechanical, electrical, plumbing, fire protection, and site utility systems to provide a modern, year-round aquatic facility that honors the historic legacy of John Chavis Memorial Park while serving the recreational and community needs of future generations.
Files
| File | Type | Posted |
|---|---|---|
| John Chavis Memorial Park - Phase 2 Aquatic Center.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity