PG0195180 - Replacement and Widening for Bridge Nos. 1615905 and 1615906 on I-95/495 over MD 4.

Open State & local contract opportunity Posted

Solicitation number
BPM059893
State
Maryland
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from emma.maryland.gov. Updated .

About this opportunity

Maryland is soliciting bids for PG0195180, the replacement and widening of Bridge Nos. 1615905 and 1615906 on I-95/495 (Capital Beltway) over MD 4 (Pennsylvania Avenue) in Prince George's County, with proposals due January 14, 2027. The source posted the opportunity on November 24, 2026. It sets no set-aside, preference, or eligibility restriction.

The scope replaces the existing dual four-span steel beam bridges, which have spans of 29'-11", two of 72'-1", and 38'-5", with dual two-span steel girder bridges of 110'-0" spans. Clear roadway on each the inner and outer loops increases from 66'-0" to 95'-6". Related work includes 0.97 miles of widening and resurfacing on I-95 and 0.62 miles on MD 4, removal of two interchange loop ramps, construction of two new spur ramps, widening of two outer entrance ramps, and a retaining wall. The work also covers new traffic barriers, stormwater management facilities, signing, lighting, traffic signals, ITS equipment, permanent pavement striping, and landscape plantings. Existing lanes in each direction on I-95/495 and MD 4 remain open at all times under staged construction, so the awardee must plan maintenance of traffic accordingly.

Opportunity text

Replacement and Widening for Bridge Nos. 1615905 and 1615906 on I-95/495 (Capital Beltway) over MD 4 (Pennsylvania Avenue). The existing dual four span steel beam bridges have span lengths of 29'-11", 2@72'-1" and 38'-5", with an existing clear roadway of 66'-0" on each the inner and outer loops. The proposed dual two span steel girder bridges have span lengths of 110'-0", with a proposed clear roadway of 95'-6½ " on each the inner and outer loops. The project also includes 0.97 miles of widening and resurfacing on I-95, 0.62 miles of widening and resurfacing for MD 4, removal of 2 of the interchange loop ramps, construction of 2 new spur ramps, widening of 2 outer entrance ramps, construction of a retaining wall, placement of new traffic barriers, stormwater management facilities, signing, lighting, traffic signals, ITS equipment, permanent pavement striping and landscape plantings for the overall project. Existing lanes of traffic in each direction on I-95/495 and MD 4 will be maintained at all times with staged construction.

Files

File Type Posted
PG0195180 - AD NOTICE.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors