Denton County, Texas is soliciting a Guaranteed Maximum Price (GMP) proposal for Phase 3 construction on the Pecan Creek Water Reclamation Plant expansion and replacement, with proposals due August 26, 2026.

The scope encompasses construction of a new headworks and lift station, equalization and peak storage ponds, biological nutrient removal / membrane bioreactor (BNR/MBR) basins, blower building, thickening and dewatering building, digesters, heat exchanger building, ultraviolet disinfection structure, control operations building, and backup diesel generators with associated medium-voltage building. Work also includes installation of sewer interceptors, removal of stockpiled materials, installation of buried utilities, modifications to the existing chemical building, and miscellaneous site improvements. The specifications document (75 MB, posted July 26, 2026) establishes detailed technical standards for mechanical, electrical, civil, and process systems; equipment installation and testing procedures; system integration; environmental compliance; and operational standards for the reclaimed-water facility, with all work required to comply with current industry standards and applicable Texas codes and regulatory requirements.

The source does not identify contract value, contract term, incumbent contractor, evaluation criteria, or a pre-bid meeting or question deadline.

Opportunity text

The Project includes the expansion/replacement of the existing Pecan Creek Water Reclamation Plant by constructing a new headworks and lift station, EQ and peak storage ponds, BNR/MBR basins, blower building, thickening/dewatering building, digesters, heat exchanger building, UV disinfection structure, control operations building, and backup diesel generators with an associated medium voltage building. Additional scopes of work include installation of sewer interceptors, removal of stockpiled overs materials, installation of buried utilities, modifications to the existing chemical building, and other miscellaneous site improvements.

Files

File Type Posted
PCWRP - GMP 3 - Specifications - 07.14.26.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors