About this opportunity

Palm Beach County Board of County Commissioners, through its Department of Environmental Resources Management, is soliciting sealed bids for the North County Comprehensive Shore Protection Project Segments II & III (Federalized), Project No. 2026ERM02R, with site-visit pre-registration due November 25, 2026 and bids due December 18, 2026. The project is funded entirely by Federal Emergency Management Agency grant funds, so the County's Local Preference, Glades Local Preference, Apprentice Incentive, Glades Resident Incentive, and Small Business Enterprise ordinances do not apply. No Disadvantaged Business Enterprise participation goal or Davis-Bacon wage rates apply.

The scope is beach fill and dune construction along approximately 3.4 miles of Jupiter and Juno Beach shoreline, from reference stations R-21.3 to R-38, using approximately 980,000 cubic yards of beach-compatible sand. Sand is dredged from an offshore borrow area 3.5 to 6.5 miles from shore and hydraulically screened to remove oversized rock and shell. Work also includes berm and dune construction to specified template elevations, post-and-rope dune fencing, and removal of an existing subsea cable within borrow-area limits (3,412 linear feet). Dune vegetation planting is awarded under a separate contract. All bidders and identified subcontractors must be certified and licensed in Florida at bid submission. Federal and state permit conditions require sea turtle, shorebird, manatee, and turbidity monitoring.

Payment is based on cross-sectional surveys against high-tolerance templates, with no payment for material placed above the template landward of compensating slope limits and deductions for areas below the required template. Substantial Completion is required within 120 calendar days of Notice to Proceed, with final completion due within 30 days of the Owner's punch list delivery. Liquidated damages apply for missed Substantial Completion. The County intends to make a single award to the lowest responsive and responsible bidder. Each bid requires a bid bond of 5% of the bid price, and the successful bidder must furnish Public Construction Payment and Performance Bonds, each at 100% of the total contract price, within seven days of the Notice of Intent to Award. The Corps of Engineers permit requires completion by October 9, 2030.

A non-mandatory pre-bid meeting is held December 1, 2026 at 10:00 a.m., virtually and in person, followed by a non-mandatory site visit at 1:30 p.m. at 14,200 U.S. Highway 1, Juno Beach, Florida. Site-visit pre-registration closes at 5:00 p.m. on November 25, 2026. Sealed bids are received until 2:00 p.m. on December 18, 2026 at the Department of Environmental Resources Management, Vista Center, 2300 Jog Road, 4th Floor, West Palm Beach, Florida. Contract documents download from the County's Vendor Self-Service website, where bidders must register before award.

Files

File Type Posted
Virtual Meeting Link.docx DOCX document
Exhibit_B.pdf PDF
Exhibit E Cover.pdf PDF
Exhibit_F - Screened Material Disposal.pdf PDF
Exhibit_A.pdf PDF
Exhibit_C.pdf PDF
2026ERM02R_Solicitation and Technical Specifications.pdf PDF
Exhibit_D.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors