Palm Beach County Board of County Commissioners, through its Department of Environmental Resources Management, is soliciting sealed bids to place approximately 980,000 cubic yards of beach-compatible sand along Palm Beach County shoreline under the North County Comprehensive Shore Protection Project 2026/27 Segments II & III, with a non-mandatory pre-bid meeting on November 3, 2026 and bids due November 18, 2026. The project is funded entirely by the Federal Emergency Management Agency, which excludes the county's Local Preference, Glades Local Preference, Apprentice Incentive, Glades Resident Incentive, and Small Business Development ordinances. The county does not acknowledge a Disadvantaged Business Enterprise participation goal for this federally funded project.
Scope covers all plant, labor, equipment, and materials to excavate, transport, screen, place, and shape sand from a permitted offshore borrow area located 3.5 to 6.5 miles northeast of the site. The sand will nourish approximately 17,800 feet of shoreline between FDEP monuments R-21 and R-38, from about 100 feet south of the Jupiter Reef Club to the Juno Ocean Club. Work also includes removing approximately 3,413 feet of offshore cable in the borrow area and 17,000 feet of post-and-rope, plus mobilization, demobilization, and access-site restoration. Bidders and subcontractors must hold Florida licensure and certification at bid submission and valid Palm Beach County business tax receipts. Bidders must also furnish Buy American Act and debarment/suspension certifications. Davis-Bacon wage rates do not apply.
Bid bonds equal 5% of the bid price. The successful bidder must furnish public construction payment and performance bonds, each equal to 100% of the total contract price, within 14 days of award notification.
The contract term is 120 calendar days to substantial completion, with final completion due within 30 days after receipt of the owner's punch list. Liquidated damages are $1,925 per calendar day for missed substantial or final completion deadlines. The county intends to award to a single contractor and reserves the right to make multiple awards.
The pre-bid meeting on November 3, 2026 at 10:00 a.m. is followed by a non-mandatory site visit at 1:30 p.m. at the staging area at 14,200 U.S. Highway 1, Juno Beach, Florida. Sealed bids close at 2:00 p.m. on November 18, 2026. The solicitation was posted October 26, 2026.
Opportunity text
The Work covered by this section consists of furnishing all plant, labor, equipment, supplies and material; preparing and restoring the access site(s); surveying; and performing all operations in connection with the excavation, transport, screening, placement, and shaping of approximately 980,000 cubic yards of beach-quality sand fill from the permitted offshore borrow area to nourish approximately 17,800 ft of shoreline in Palm Beach County, FL for the North County Comprehensive Shore Protection Project 2026/27 Segments II & III. The limits of work range between about 100 ft south of the Jupiter Reef Club to the Juno Ocean Club (near FDEP R-monument R-21 to R-38, as shown in the Plans). Additionally, the work includes the removal of approximately 3,413 ft of offshore cable in the borrow area, and 17,000 ft of post-and-rope. The Contractor shall perform operations necessary for the movement of personnel, dredge, equipment, supplies, and incidentals to and from the project site associated with dredging, transporting, and filling from the Project borrow area. The mobilization cost shall include the establishment of temporary offices, buildings, utilities, traffic control, safety equipment and first aid supplies, sanitary and other facilities, the costs of Bonds and insurance, and the cost of any other pre-construction expense necessary for the start of the Work, as required by the Contract Documents and State and local laws and regulations. The demobilization cost shall include final clean-up and restoration of access point activities. This section shall also include all other costs required by the Contract Documents for which there is not a separate Pay Item. All costs connected with the mobilization and demobilization of all the Contractor's equipment and personnel to and from the job site shall be included in the Contract. The Contractor shall excavate, transport, handle, place, shape, grade, and survey beach sand fill from the prescribed borrow area(s) as required under this Contract. All costs associated with beach sand fill placement, including, but not limited to, QA/QC, excavation, transport, delivery, handling, placement, shaping and grading, escarpment removal, surveys for payment, surveys for acceptance, and reporting shall be included in the Contract.
Files
| File | Type | Posted |
|---|---|---|
| palm beach Solicitation Documents and Technical Specs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity