Patricia & Ashby Stormwater Pump Station: 2nd Injection Well
Closed State & local contract opportunity Posted
- Solicitation number
- ITB 26-014-0-2026/LT
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Key West, Florida is requesting bids for permitting and construction of a second stormwater injection well at the Patricia & Ashby Stormwater Pump Station, with bids due September 23, 2026 at 3:00 p.m. EDT under ITB issued August 18, 2026.
The scope includes well casing and well head piping with air valve installation in a manhole; removal and replacement of two 24-inch isolating plug valves in new concrete vaults; new 24-inch spool and connection piping; and surface restoration with asphalt pavement, unimproved shoulder, and concrete sidewalk. Site preparation encompasses maintenance of traffic and erosion and sediment control. All work must comply with the plans, specifications, applicable codes, and permitting requirements. The contractor is responsible for all labor, materials, equipment, and services necessary for a complete and operational stormwater pump station.
The ITB package includes detailed construction drawings and specifications (6.26 MB) and an addendum issued August 20, 2026. A 5 percent bid bond is required. Electronic plan documents are available through DemandStar. Twenty-nine plan holders have registered, indicating substantial competitive interest. No pre-bid conference is scheduled. Commodity codes assigned include irrigation and drainage architectural services, drainage engineering, and public utilities maintenance and repair.
The source does not disclose estimated contract value, contract term, incumbent contractor, or evaluation criteria.
Opportunity text
The project consists of permitting and construction of a 2nd stormwater injection well at an existing stormwater pump station; installing well casing and well head piping with air valve in manhole; remove and replace two 24 isolating plug valves in new concrete vaults; new 24 spool and other connection piping, and surface restoration to include asphalt pavement, unimproved shoulder, and concrete sidewalk. Work includes all labor, materials, equipment, and services necessary to complete the facility as shown in the ITB construction plans. Major components of the work include site preparation with MOT; erosion and sediment control; well permitting and drilling; well head piping with air valve in concrete manhole; two new 24 plug valves in concrete vaults; connection piping, and all associated civil work required for a complete and operational stormwater pump station. The Contractor shall perform all work in accordance with the plans, specifications, applicable codes, and permitting requirements.
Files
| File | Type | Posted |
|---|---|---|
| key west OpenBids-DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity