Pasadena Hydrogen Fueling Station Feasibility Study
Closed State & local contract opportunity
- Solicitation number
- 2023-Informal-024
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 907 Architectural And Engineering Services, Non-Professional
- 90740 Engineering Services, Non-Licensed (Not Otherwise Classified)
- 91107 C.i.p., Architectural/Engineering Services
- 92064 System Implementation And Engineering Services
- 925 Engineering Services, Professional
- 92536 Engineering Services (Not Otherwise Classified)
- 92551 Hazardous Waste Engineering Services (Incl. Remedial Investigations And Feasibility Studies For Waste Sites)
- 92573 Ocean Engineering Services
- UNSPSC codes
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81102702 Process control system design and engineering service
- 81102100 Ocean engineering
- 81111500 Software or hardware engineering
Show all 18
- 81102501 Mine permitting service
- 81103300 Geomatics engineering
- 81102101 Coastal engineering
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- Point of contact
-
- Nicole Sinovsky nsinovsky@cityofpasadena.net (626) 744-6761
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Pasadena Transportation Department is seeking quotes for a Hydrogen Fueling Station Feasibility Study (Project 2023-Informal-024) to identify the most suitable among three city-owned locations for developing a hydrogen fueling station. The study aims to support the city's CARB Rollout Plan for transitioning to a zero-emission transit fleet. Deliverables include comprehensive site feasibility analysis for three specific locations: Eaton Canyon-Civil Yard, PCC-CEC (north of Foothill Blvd), and Kinneloa (north of Del Mar Blvd). The study must provide fuel consumption projections, conceptual layout and utility connections, and a 10% conceptual design with equipment plan and construction timeline. Proposers must have a minimum of five years of experience providing similar services and will be evaluated based on experience (50 points), cost proposal (45 points), and local Pasadena business status (5 points). Proposals are due electronically by December 29, 2022, at 1:30 pm, with questions accepted until December 27, 2022, at 2:00 pm. The project timeline spans from January 3, 2023, to June 30, 2023, with site analyses to be completed within 30-60 days of Notice to Proceed.
Proposers must submit all documentation through the City's eProcurement Portal and provide a Unique Entity Identifier (UEI) from SAM.gov, with failure to do so potentially resulting in a non-responsive bid. The procurement includes mandatory equal opportunity employment forms, including a Vendor Questionnaire (AA-1), Project Workforce Utilization form (AA-2), and an optional Current Permanent Workforce Utilization form (AA-3). While no specific set-aside designations are explicitly mentioned, the evaluation process appears to provide a slight advantage to local Pasadena businesses. Contractors will need to submit additional documentation within 10 calendar days of selection, including tax identification, business licenses, and insurance documentation. The study's findings will be used to support future grant applications for hydrogen fueling station facility development. Although no specific budget range is provided in the documents, the comprehensive nature of the study suggests a significant investment in advancing the city's zero-emission transit infrastructure goals.
Opportunity text
Request for quotes to conduct a study to identify which of three City owned locations are the most ideal candidate to develop a hydrogen fueling station
Files
| File | Type | Posted |
|---|---|---|
| Pasadena_Hydrogen_Fueling_Station_Feasibility_Study.pdf | ||
| Unique_Entity_ID_(SAM).pdf | ||
| AAs_Updated_V4.pdf | ||
| Disclosure_of_Lobbying_Activities.pdf | ||
| RELEVANT_EXPERIENCE_FORM.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity