Park Hall Basement Water Infiltration & Connector Drainage
Cancelled State & local contract opportunity Posted
- Solicitation number
- 2122480
- State
- New York
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Richard Merritt richard.merritt@oswego.edu (315) 312-2208
Updated .
About this opportunity
The State University of New York at Oswego is requesting qualifications for architectural and engineering design services to address water infiltration and drainage at Park Hall and the Park/Wilber Connector, with qualifications due June 9, 2025. MWBE participation goals of 30 percent overall (15 percent MBE and 15 percent WBE) and a 6 percent SDVOB goal apply.
The scope encompasses replacement of deteriorated red brick pavers at North and South entrances, saw cutting and replacement of concrete slabs in basement sump pump and electrical rooms, installation of new under-slab drainage systems, evaluation of foundation wall penetrations, and removal and replacement of exterior drainage with larger drains connected to existing storm structures. The designer must deliver all phases from Schematic Design through Construction Documents, plus construction administration, RFI responses, submittal reviews, and project closeout.
The estimated construction budget is $600,000 to $900,000; the basic design fee will be negotiated after consultant selection. No cost proposals should accompany qualifications. The contract will be structured as a State University of New York Consultant Contract (Form 7555-10 or 7555-10A) on a lump sum basis, with contract award anticipated in July 2025 and construction scheduled for summer 2026 with completion by August 2026.
The selection committee will evaluate submissions based on qualifications, experience, approach, capability, schedule availability, MWBE participation, and references, and will establish a short list of five firms. Submissions must be delivered in three paper copies plus one electronic copy on a flash drive to SUNY Oswego Purchasing Office, Culkin Hall Suite 402, Oswego, NY 13126, Attention: Richard Merritt (315-312-2208). A facility tour and review of existing drawings can be arranged. The selected consultant must carry insurance of at least $2,000,000 per claim, maintain workers' compensation coverage naming SUNY as additional insured, and comply with New York State prevailing wage requirements.
Opportunity text
The State University of New York requests your consideration for the design of the above Project. Attached for your completion in this matter is the Request for Qualifications (RFQ) with instructions. The Agreement for the project shall be a Lump Sum agreement. Responses to the RFQ must be received by SUNY Oswego Purchasing Department, 402 Culkin Hall, Oswego, NY 13126 at the campus on or before 4:30pm on Monday June 9, 2025. Please provide all information requested in the instructions contained within the RFQ. The designated Campus contact is Richard Merritt, Purchase Associate, 402 Culkin Hall, Oswego, NY 13126. A tour of the facility and review of the existing drawings can be arranged by contacting Richard Merritt at 315-312-2208 Bid documents are attached to this ad, or can be obtained by emailing the designated project contact. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00%
Files
| File | Type | Posted |
|---|---|---|
| RFQ 100318 Park Hall.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity