Paint Booth System RFP 85-26
Closed State & local contract opportunity Posted
- Solicitation number
- BD-26-1206-40000-40000-129924
- State
- Massachusetts
- Responses due
Opportunity facts
- Points of contact
-
- Design and Construction info@mbta.com (617) 222-5995
- Priscilla Power invoices@mbta.com (617) 222-3235
Opportunity details come from commbuys.com. Updated .
About this opportunity
The Massachusetts Bay Transportation Authority is requesting proposals for a paint booth system supply and installation at its Charlestown facility under RFP 85-26, with proposals due July 10, 2026. Proposers must demonstrate compliance with Massachusetts prevailing wage requirements and applicable disadvantaged business enterprise participation goals.
The scope encompasses a complete spray booth system capable of supporting vehicle maintenance and coating operations, including air handling, lighting, ventilation, and safety features compliant with applicable environmental and occupational safety standards. The MBTA expects site preparation coordination, equipment delivery, installation, testing, and commissioning to operational readiness. Paint product specifications are detailed across multiple documents establishing technical requirements for coverage rates, application methods, drying times, finish quality, and durability under operational conditions. Bidders must submit pricing as a firm fixed price for equipment supply and installation.
The MBTA has designated Building 4 at 21 Arlington Ave, Charlestown, MA as the installation location and site visit venue. Site visits are available and encouraged; bidders should enter the property at 41 Arlington Ave, proceed to the conference room on the second floor of the main building, and contact Drew Hall for the on-site visit. The evaluation criteria focus on technical capability, equipment specifications, installation timeline, vendor qualifications, completeness of technical specifications, warranty terms, delivery and installation schedules, and prior experience with similar industrial paint booth installations.
Contractors must obtain and maintain minimum insurance coverage as detailed in the attachment "85-26 Minimum Insurance Requirements.pdf" and provide certificates of insurance throughout the contract term. Bidders must reference the example paint item specification documents when submitting proposals to ensure quoted materials meet stated requirements.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity