PennDOT is soliciting bids for Project 105441, the PA 18 Bridge Preservation over Beaver River, with bids due at the December 17, 2026 let at 11:00 a.m. The federally funded contract specifies no DBE set-aside (0 percent), and bidders must hold prequalification.
The work preserves two multi-span structures on State Route 18, Section B62, across a 2,500-linear-foot (0.47-mile) corridor in New Brighton Borough and the City of Beaver Falls, Beaver County. Scope includes deck overlay, joint replacement, concrete repairs, painting, and miscellaneous construction, with asphalt mixture placement, temporary traffic control, deck preparation, joint sealing, and expansion dam replacement. Environmental compliance work includes bat surveys and pedestrian shuttle services. The contractor must comply with Buy America and Title VI non-discrimination assurances and coordinate with CSX and Norfolk Southern railroads. Railroad protective liability insurance requirements are $5,000,000 per occurrence and $10,000,000 aggregate for CSX work, and $2,000,000 for Norfolk Southern work. Road user liquidated damages range from $1,400 to $16,700 per day, depending on traffic restriction violations.
The project falls within the $10,000,000 to $12,499,999.99 cost range. The anticipated Notice to Proceed is February 1, 2027, with required completion by September 28, 2028. No pre-bid meeting is scheduled. The bid package was posted November 20, 2026.
Opportunity text
The description and location of the project is as follows: For the bridge preservation of two multi-span structures including deck overlay, joint replacement, concrete repairs, paint, and other miscellaneous construction, all within a length of 2,500 linear feet (0.47 miles) as indicated on the approved drawings included in the bid package for State Route 0018, Section B62, in Beaver County, New Brighton Borough and City of Beaver Falls, Commonwealth of Pennsylvania. This project being situated as follows: From points approximately 395 feet north of 5th Street at Segments 0600/0601, Offsets 0405/0430 (Station 593+00/592+00) to approximately 340 feet south of 4th Street at Segments 0610/0611, Offsets 2167/2217 (Station 618+00).