Overwrote with new project - Plz fix - Northeast Water & Wastewater Utility Improvements Program – Work Package 1, 3, 4, & 6
Closed State & local contract opportunity Posted
- Solicitation number
- CMAR - RFEI
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Rylan Edgmon rylan@smithco.cc
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Smithco Construction, Inc., Construction Manager at Risk for El Paso Water, is requesting Statements of Qualifications from subcontractors and suppliers for Work Packages 1, 3, 4, and 6 of the Northeast Water & Wastewater Utility Improvements Program, with responses due November 13, 2026. The work is to be delivered under GMP 2 and GMP 3 in El Paso, Texas, within El Paso County.
Anticipated trades include, but are not limited to, AWWA D110 Type III prestressed concrete tanks, pump station structural and mechanical work, electrical and instrumentation, large-diameter pipeline installation, trenchless crossings and casings, earthwork and site work, paving and restoration, and pipe, valve, and material supply. Work Package 1 covers the Loma Real Storage Tank and Pump Station, Work Package 3 the Northeast Franklin Water Transmission Main Phase 2, Work Package 4 the Northeast Franklin Improvements Water Phase 3, and Work Package 6 the Northeast Dyer/Railroad Force Main.
The description also lists Work Package 2 (Franklin 1B Storage Tank and Transmission Main), which the title and attached file omit.
Opportunity text
Smithco Construction, Inc., Construction Manager at Risk for El Paso Water, is requesting Statements of Qualifications from qualified subcontractors and suppliers for the following work packages of the Northeast Water & Wastewater Utility Improvements Program in El Paso, Texas, to be delivered under GMP 2 and GMP 3: Work Package 1 Loma Real Storage Tank and Pump Station; Work Package 2 Franklin 1B Storage Tank and Transmission Main; Work Package 3 Northeast Franklin Water Transmission Main Phase 2; Work Package 4 Northeast Franklin Improvements Water Phase 3; and Work Package 6 Northeast Dyer/Railroad Force Main. Anticipated trades include, but are not limited to: AWWA D110 Type III prestressed concrete tanks, pump station structural and mechanical, electrical and instrumentation, large-diameter pipeline installation, trenchless crossings and casings, earthwork and site work, paving and restoration, and pipe, valve, and material supply.