The Oregon Department of Transportation (ODOT) is requesting subcontractor and supplier bids for the OR229 Fuller & Ojalla (Siletz River) Bridges project on Siletz Highway in Lincoln County, Oregon, with quotes due to prime contractor F. D. Thomas, Inc. by October 13, 2026 at 12:00 noon (prime bids close October 15, 2026 at 9:00 a.m.). This is a Federal-Aid Project subject to Davis-Bacon prevailing wage requirements, apprenticeship provisions, and good faith efforts to meet minority and female workforce utilization goals of 6.9 percent for women and 3.8 percent for minorities in Lincoln County.

The scope covers two 190-foot steel through-trusses (Bridges 00851A and 00852A) and includes traffic control (temporary and permanent signage, flagging, illumination, portable traffic signal); temporary and permanent striping; engineered temporary work access and containment systems (heating, ventilation, and lead-containment for truss coating); structural repairs and bearing replacement at multiple bents (bridge jacking, bearing replacement, concrete repair, rivet and bolt replacement); poured expansion joint seals; and sign removal and installation. F. D. Thomas will self-perform surface preparation and coating (lead-based paint removal and 3-coat organic zinc system). Containment must handle lead, chromium, and cadmium paint. Subcontractors and suppliers are sought for traffic control, striping, temporary access and containment, structural repair and bearing replacement, joint seals, signs, and material supply (bearings, joint seal materials, fasteners, and sign materials).

The contract incorporates Federal Highway Administration Form FHWA-1273 provisions effective June 25, 2026, including environmental compliance, asbestos and paint material handling, and debarment certifications. A mandatory prebid meeting is referenced in the Special Provisions. Electronic submissions are through Bid Express (www.bidx.com); paper submissions go to BJ McCartney, Construction Contracts Manager, ODOT Procurement office, Salem, Oregon. Questions should be directed to Steve Schultz, Resident Engineer, ODOT Corvallis office, or CorvallisConstruction@ODOT.Oregon.Gov.

Opportunity text

F. D. Thomas, Inc. is bidding the ODOT OR229 Fuller & Ojalla (Siletz River) Bridges project (Contract 15691; Bridges 00851A, MP 23.10, and 00852A, MP 20.66), Siletz Highway, Lincoln County, Oregon, as prime. Bid closes October 15, 2026 at 9:00 a.m. Subcontractor and supplier quotes are due to F. D. Thomas by October 13, 2026 at 12:00 noon.

F. D. Thomas, Inc. will self-perform surface preparation and coating (lead-based paint removal, 3-coat organic zinc system) of both 190-ft steel through-trusses. We are seeking subcontractor and supplier pricing for the following (bid schedule item numbers in parentheses):

  1. Traffic Control: temporary/permanent traffic control, flagging, signage and illumination, including temporary signs, changeable message signs, flaggers, flagger station lighting, drums, and the portable traffic signal
  2. Temporary & Permanent Striping: temporary flexible markers, temporary striping and bars, stripe and bar removal, and permanent longitudinal paint markings
  3. Temporary Work Access & Containment (both bridges): engineered access, containment, heating and ventilation for truss coating, plus access and containment for bearing replacement at Bent 3 and concrete repairs at Bents 2 and 3. Containment must handle lead, chromium and cadmium paint. Structural repairs must be complete before coating containment is installed
  4. Structural Repair & Bearing Replacement (both bridges): bridge jacking at Bent 3, bearing replacement, structural steel maintenance, reinforcing bar repair, concrete repair (Fuller 8 SF, Ojalla 354 SF), rivet/bolt replacement, and bridge removal work.
  5. Poured Joint Seal (both bridges): expansion joint seal, with manufacturer's technical representative required
  6. Signs: removal of existing signs, sign support footings, perforated steel square tube anchor sign supports, and standard sheeting aluminum signs
  7. Construction Survey
  8. Material Suppliers: bearing devices, joint seal materials, fasteners (rivets and bolts), sign materials, bridge identification markers, and coating materials. Build America Buy America requirements apply.

Federal Davis-Bacon and Oregon BOLI prevailing wage rates apply.

F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.