OAAA, 2010, 082603, Buckley Bldg 1520 Bathroom Remodel

Closed State & local contract opportunity Posted

Solicitation number
IFB1 OAAA 2027000017 3
State
Colorado
Responses due

Opportunity facts

Jurisdiction
NIGP code
Point of contact

Updated .

About this opportunity

The State of Colorado Department of Military and Veterans Affairs is requesting sealed bids for a bathroom and shower remodel at Building 1520, Buckley Space Force Base, with bids due September 15, 2026 at 10:00 a.m. Colorado labor must comprise at least 80% of work performed under C.R.S. 8-17-101, with preference given to Colorado resident bidders.

Bidders must demonstrate a minimum of two completed projects exceeding $200,000 in hard costs, bonding capacity up to $250,000, two years of operation under the same business name, and no prior state termination for non-performance. A mandatory pre-bid conference and site tour were held August 25, 2026 at Buckley SFB Visitor's Center or Building 1520; clarifications were due September 1, 2026 at 10:00 a.m. Addendum #1 confirmed no contractor questions were submitted at the mandatory pre-bid meeting. Addendum #2, issued September 3, 2026, modified architectural sheets A1.0, A1.2, and A1.5; all other drawings and the project manual remain unchanged. Bid opening occurs via conference line at 720-250-4000, extension 1457#.

The scope covers selective demolition and remodel of two toilet and shower rooms totaling approximately 330 square feet in the Special Operations Detachment, Airborne readiness center. Work includes new ADA-compliant toilet stalls, accessible transfer shower stalls, standard shower stalls, urinals, lavatory countertops with integral sinks, mirrors, grab bars, new suspended gypsum board ceiling, flooring, fiber-reinforced plastic panel wainscoting, and electrical, mechanical, and plumbing modifications. All construction must comply with the 2024 International Building Code, IEBC, IMC, IECC, DOD Building Code UFC 1-200-01, and ANSI/ICC A117.1 ADA Standards. One additive bid item offers replacement of heat-welded sheet vinyl flooring (base bid) with resinous epoxy flooring and integral 4-inch cove base with cap. The estimated project cost is $225,000. A bid bond of not less than 5% of total bid amount is required. Construction is scheduled November 1, 2026 through January 31, 2027. Award intent and contract approval are anticipated for September 2026. A Notice of Final Settlement will be required as the project exceeds $150,000.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors