NW District Gallatin Maintenance Sewer Connection Project

Awarded State & local contract opportunity Posted

Solicitation number
IFB605CO23002821
State
Missouri
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from webprocure.proactiscloud.com. Updated .

About this opportunity

The Missouri Department of Transportation (MoDOT) is seeking a qualified vendor for the NW District Gallatin Maintenance Sewer Connection Project through an Invitation for Bid (IFB). The project requires the installation of two grinder pumps in an existing pump tank, along with a precast valve vault, valve, flow meter, piping, and associated appurtenances at the Gallatin Maintenance Complex. Each grinder pump station must include a 15 HP motor, variable frequency drives (VFDs), a control panel, and pumps rated at 35 GPM at 204 ft TDH. The scope also encompasses installing a 2-inch force main approximately 3 miles long, with air valves, road crossings, and connection to an existing city manhole. The flow meter must be compatible with the city of Gallatin's Sensus Flexnet system, specifically requiring a Sensus 512M device with pulsed output. A mandatory pre-bid conference is scheduled for June 27, 2023, at 10:30 AM CST at the project site, with bids due on August 1, 2023, at 2:00 PM CST. The contract will be awarded to the lowest responsive and responsible bidder, with a project completion deadline of May 22, 2024.

The solicitation encourages Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) participation, with specific goals of 10% MBE and 5% WBE involvement. Bidders must provide a 5% bid bond and the successful contractor will be required to furnish a 100% performance and payment bond. The project is subject to prevailing wage requirements under Chapter 290 RSMo for Daviess County, and contractors must comply with Missouri's employment regulations, including E-Verify enrollment and affidavits regarding unauthorized aliens. Liquidated damages of $1,000 per day will be assessed for late completion. Contractors must maintain specific insurance coverage, including general liability of $500,000/$4,000,000, automobile liability of $500,000/$4,000,000, and workers' compensation coverage. While no specific budget range is explicitly stated, the project involves substantial infrastructure work including pump stations, force main installation, and electrical components. The contract will be awarded on a lump sum basis, with payment terms of net 30 days, suggesting a potentially significant investment in municipal infrastructure improvement.

Opportunity text

MoDOT seeks a qualified vendor to install two (2) grinder pumps in an existing pump tank, precast valve vault, valve, flow meter, piping, and appurtenances. The flow meter shall have a pulsed output and Sensus 512M device for compatibility with the city of Gallatin Sensus Flexnet system. Each grinder pump station will include a 15 Hp motor, VFDs, control panel, and pumps with a rated capacity of 35 gpm at 204 ft TDH as specified. MoDOT will receive bids electronically through MissouriBUYS, via mail, UPS, or FEDEX. It is required you contact the buyer of record via email at Michael.Yoder@modot.mo.gov five business days before bid closing if you intend to submit a hard copy bid.

Files

File Type Posted
IFB605CO23002821_Sep_30_24_solicitation_doc.pdf PDF
IFB605CO23002821_Oct_21_24_solicitation_doc.pdf PDF
IFB605CO23002821_Oct_28_24_solicitation_doc.pdf PDF
IFB605CO23002821_Nov_4_24_solicitation_doc.pdf PDF
IFB605CO23002821_Nov_25_24_solicitation_doc.pdf PDF
IFB605CO23002821_Apr_28_25_solicitation_doc.pdf PDF
IFB605CO23002821_May_12_25_solicitation_doc.pdf PDF
IFB605CO23002821_Sep_16_24_solicitation_doc.pdf PDF
IFB605CO23002821_Sep_23_24_solicitation_doc.pdf PDF
IFB605CO23002821_Oct_7_24_solicitation_doc.pdf PDF
IFB605CO23002821_Oct_14_24_solicitation_doc.pdf PDF
IFB605CO23002821_Nov_18_24_solicitation_doc.pdf PDF
IFB605CO23002821_Dec_9_24_solicitation_doc.pdf PDF
IFB605CO23002821_Dec_30_24_solicitation_doc.pdf PDF
IFB605CO23002821_Jan_13_25_solicitation_doc.pdf PDF
IFB605CO23002821_Feb_24_25_solicitation_doc.pdf PDF
IFB605CO23002821_Apr_7_25_solicitation_doc.pdf PDF
IFB605CO23002821_Jun_2_25_solicitation_doc.pdf PDF
IFB605CO23002821_Jun_9_25_solicitation_doc.pdf PDF
solicitation_summary.pdf PDF
IFB605CO23002821_Sep_9_24_solicitation_doc.pdf PDF
IFB605CO23002821_Nov_11_24_solicitation_doc.pdf PDF
IFB605CO23002821_Dec_2_24_solicitation_doc.pdf PDF
IFB605CO23002821_Jan_6_25_solicitation_doc.pdf PDF
IFB605CO23002821_Mar_17_25_solicitation_doc.pdf PDF
IFB605CO23002821_Mar_31_25_solicitation_doc.pdf PDF
IFB605CO23002821_Apr_14_25_solicitation_doc.pdf PDF
IFB605CO23002821_Apr_21_25_solicitation_doc.pdf PDF
IFB605CO23002821_May_5_25_solicitation_doc.pdf PDF
IFB605CO23002821_Jun_23_25_solicitation_doc.pdf PDF
IFB605CO23002821_Aug_23_24_solicitation_doc.pdf PDF
IFB605CO23002821_Aug_26_24_solicitation_doc.pdf PDF
IFB605CO23002821_Aug_30_24_solicitation_doc.pdf PDF
IFB605CO23002821_Sep_2_24_solicitation_doc.pdf PDF
IFB605CO23002821_Jan_20_25_solicitation_doc.pdf PDF
IFB605CO23002821_Jan_27_25_solicitation_doc.pdf PDF
IFB605CO23002821_Feb_3_25_solicitation_doc.pdf PDF
IFB605CO23002821_Mar_10_25_solicitation_doc.pdf PDF
IFB605CO23002821_May_19_25_solicitation_doc.pdf PDF
Show all 39

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity