NTB 1007091 Embarcadero West Rail Safety Project Phase 1 (OVR/Market and Oak)
Closed State & local contract opportunity Posted
- Solicitation number
- 426551
- State
- California
- Responses due
Opportunity facts
Opportunity details come from apps.oaklandca.gov. Updated .
About this opportunity
The City of Oakland Department of Transportation is soliciting bids or proposals for the Embarcadero West Rail Safety Project Phase 1 (OVR/Market and Oak) under Notice to Bidders 1007091, with submissions due September 3, 2026. This is a multi-agency infrastructure project involving the Port of Oakland, Union Pacific Railroad, and the Capitol Corridor Joint Powers Authority.
The scope encompasses safety and accessibility improvements at two at-grade railroad crossings on Embarcadero West (at Oak Street and Market Street), including updated pedestrian and vehicle infrastructure on Oak and Market Streets between Embarcadero West and 3rd Street; a new separated two-way bicycle track on Oak Street between Embarcadero West and 3rd Street and on Embarcadero West between Oak Street and Alice Street; and a new overweight vehicle route through the industrial Port of Oakland between Market Street and Adeline/Middle Harbor Road to divert overweight trucks from the historically disadvantaged West Oakland neighborhood.
The project involves complex environmental and geotechnical conditions: stormwater management with new storm drain pipes (12-inch to 48-inch reinforced concrete pipe), bioretention basins, and curb inlets across approximately 14.7 acres; compliance with both City of Oakland Storm Drainage Design Standards and Port of Oakland 2015 Post-Construction Stormwater Design Manual; flexible pavement design accounting for silty sand and bay mud subgrades with historically high groundwater and liquefaction potential; and specialized construction worker protection and lined bioretention facilities to address elevated metal concentrations in shallow soils. The project lies within a seismic hazard zone requiring liquefaction and ground-shaking assessment per the Seismic Hazards Mapping Act of 1990.
Any contractor performing work on Union Pacific Railroad property must obtain a Contractor's Right of Entry agreement, which requires a $1,025 administrative fee, submission to Union Pacific Real Estate Representative Karina Kiewel, and a minimum 30-day processing period. The contractor bears all costs associated with work on railroad property, including Union Pacific-related expenses.
Opportunity text
PROJECT NO. 1007091 Embarcadero West Rail Safety Project Phase 1 (OVR/Market and Oak) The Embarcadero West Rail Safety Project - Phase 1 (OVR/Market and Oak) aims to improve safety and accessibility in the proximity of two at-grade public railroad crossings on Embarcadero West at the intersections of Oak Street and Market Street. The scope includes updated pedestrian and vehicle improvements on Oak Street and Market Street between Embarcadero West and 3rd Street, as well as a new, separated two-way bicycle track on Oak Street between Embarcadero West and 3rd Street, and on Embarcadero West between Oak Street and Alice Street. The project also aims to create a new overweight vehicle route (OVR) through the industrial Port of Oakland area, between Market Street and Adeline/Middle Harbor Road. The OVR will re-route overweight trucks away from the currently-used route that travels through the historically disadvantaged West Oakland neighborhood.
Files
| File | Type | Posted |
|---|---|---|
| 1007091_StormwaterReport.pdf | ||
| UPRR Contractor's Right of Entry.pdf | ||
| 1007091_SeismicHazRpt.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity