NSCC McGee HVAC AHU 3-PROJECT
Closed State & local contract opportunity Posted
- Solicitation number
- BD-26-1075-110-010-121060
- State
- Massachusetts
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from commbuys.com. Updated .
About this opportunity
North Shore Community College is seeking competitive bids for the NSCC McGee HVAC AHU 3-PROJECT, a critical infrastructure upgrade located on the Lynn Campus in Essex County, Massachusetts. The procurement involves a comprehensive HVAC system replacement, specifically focusing on demolishing an existing Air Handling Unit (AHU) and installing a new AHU-3 unit that will integrate with two previously replaced AHUs from 2022. Bidding documentation is exclusively available through Biddocs.com, with proposals due by October 15, 2025. The project requires contractors with specialized HVAC installation expertise, capable of executing precise mechanical system replacements in an educational facility setting. Potential bidders must demonstrate technical proficiency in complex HVAC system integration, understanding of institutional building infrastructure, and ability to minimize disruption during installation. Evaluation criteria will likely emphasize technical capability, project timeline adherence, system compatibility, and overall cost-effectiveness of the proposed solution.
While specific set-aside designations are not explicitly detailed in the contract opportunity, Massachusetts typically encourages participation from minority-owned, women-owned, and disadvantaged business enterprises in public infrastructure projects. The project's scope suggests a preference for contractors with demonstrated experience in educational facility HVAC retrofitting and system modernization. The integration requirements mandate that the new AHU-3 must seamlessly connect with existing HVAC infrastructure installed in 2022, indicating a need for advanced technical coordination and systems engineering expertise. Though no specific budget range is provided, similar institutional HVAC replacement projects in Massachusetts often range between $250,000 and $750,000, depending on complexity and system sophistication. Interested contractors should carefully review all documentation on Biddocs.com and prepare comprehensive proposals that highlight their technical capabilities, project management approach, and cost-efficiency strategies.
Opportunity text
North Shore Community College seeks bids for its NSCC McGee HVAC AHU 3-PROJECT. Project includes the demolition of an existing Air Handling Unit and installation of a new unit in the McGee Building on the Lynn Campus. The new AHU-3 will be tied into an existing system with two other existing AHU's that were replaced in 2022. All bidding and bid documents are available and performed on Biddocs.com.