About this opportunity
The Pennsylvania Department of Transportation (PennDOT) is soliciting bids for the North York Widening #2 project (SR 0083-091 and SR 0083-090), a major Interstate 83 reconstruction in York County spanning Springettsbury, Manchester, and Spring Garden Townships and North York Borough, with bids due October 1, 2026 at 11:00 a.m. Prequalification is mandatory.
The scope encompasses I-83 widening to three lanes in each direction with 12-foot median and outside shoulders over 3.201 miles; replacement of three major bridges carrying I-83 over the Norfolk Southern Yard (5-span replaced with single span), SR 1033 Loucks Mill Road (3-span to single span), and Codorus Creek (7-span to single 8-span structure); replacement of a 2-span bridge over Mill Creek with a single-span structure; relocation of Ramps X and Z at Exit 21; reconstruction of SR 4055, T-511, T-509/T-513, and Columbia Avenue; lengthening of an existing culvert under I-83 and construction of new culverts under relocated Ramp X and a pedestrian crossing; relocation of approximately 4,600 linear feet of Mill Creek with in-stream structures and floodplain wetland basins; and auxiliary work including four overhead sign structures, highway lighting, ITS, signal upgrades, pavement markings, sidewalk and pedestrian ramps, utility relocations, landscaping, and erosion control. The project includes railroad protective services for Norfolk Southern and CSX operations, water testing and filtration, and PA American Water sewer interceptor protection.
The estimated contract value is between $200 million and $225 million. Structure work comprises 57 percent of total project cost. The project is federally funded with federal oversight. A notice to proceed is anticipated November 16, 2026, with required completion by June 17, 2031. All addenda will be posted electronically through ECMS.
Opportunity text
The SR 0083-091 project consists of the widening, realignment, and reconstruction of I-83, with three lanes in each direction throughout the project limits plus 12-foot median and outside shoulders. Additional roadway improvements include the relocation of Ramps X and Z at Exit 21 and the reconstruction of SR 4055 (Toronita Street), T-511 (Queen Street), T-509/T-513 (10th Avenue), and Columbia Avenue. The I-83 bridge over Mill Creek (2-span) will be replaced with a single-span bridge. Three bridges carrying I-83 over the Norfolk Southern Yard (5-span), SR 1033 (Loucks Mill Road) (3-span), and Codorus Creek (7-span) will be replaced with a single 8-span structure. Other structure work includes the lengthening of an existing culvert running under I-83, the construction of a new culvert under relocated Ramp X, and the construction of a new pedestrian culvert providing access to the east and west sides of I-83. This project will also relocate roughly 1,450 linear feet of Channel 31 located along Columbia Avenue. Other work includes: four overhead sign structures, highway lighting, ITS, signal upgrades, pavement markings, sidewalk & pedestrian ramps, incorporated utility relocation work, planting/landscaping, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for State Route 0083, Section 091, in York County, Springettsbury, Manchester, & Spring Garden Townships and North York Borough, from 1,700 feet south of the Eberts Lane overpass at Segment 0184/0185 Offset 1146/1146 to just south of the I-83 overpass of SR 0030 at Segment 0210/0211 Offset 0487/0487. The SR 0083-090 project consists of the relocation of roughly 4,600 linear feet of Mill Creek which runs adjacent to I-83. The Mill Creek relocation will include the installation of numerous in-stream structures and extensive planting in the adjacent floodplain. Additional improvements include the grading and installation of floodplain wetland basins adjacent to Eden Road and Graham Street. Other work includes: incorporated utility relocation work, planting/landscaping, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for State Route 0083, Section 090, in York County, Springettsbury, Manchester, & Spring Garden Townships, from 750 feet east (upstream) of the Eberts Lane bridge over Mill Creek to a point just north (downstream) of the I-83 overpass of Mill Creek. Overall project length is 16,901.26 linear feet (3.201 miles).