North Wolcott road floodplain Restoration Project

Closed State & local contract opportunity Posted

Solicitation number
73804
State
Vermont
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from vermontbusinessregistry.com. Updated .

About this opportunity

The Town of Wolcott, Vermont is soliciting proposals for the North Wolcott Road floodplain restoration project along the Wild Branch, with proposals due June 17, 2026. The project addresses repeated flood damage and streambank erosion that has closed North Wolcott Road and threatened utilities and adjacent properties.

The scope includes re-establishing a former flood chute, stabilizing the eroding streambank, revegetating the floodplain, and implementing bank stabilization measures to reduce future fluvial erosion and phosphorus loading while providing flood mitigation benefits and improved floodplain access. The Wild Branch stream channel has migrated 50–100 feet between 2020 and end of 2023 in the project area, and between 310 and 260 feet cumulatively since 1995. Significant damage occurred during the January 2018 ice jam and flood (which caused a complete road washout and utility pole failure, resulting in a two-week road closure), the Halloween Storm of 2019, and the July and December 2023 floods. The Town has installed temporary riprap protection but requires permanent restoration.

SLR International Corporation completed a Flood Mitigation Study in 2020 identifying this site as a restoration candidate, and updated the floodplain restoration concept design in 2025. The Local Connecticut River Program Collaborative (LCPC) has coordinated with the Vermont Department of Environmental Conservation Rivers Program and the Vermont River Conservancy during project development. Performance location is along the Wild Branch near the intersection of Heath Road and North Wolcott Road in Wolcott, Grand Isle County.

Opportunity text

This project is along the Wild Branch along North Wolcott Road in Wolcott near/just north of the intersection of Heath Road and North Wolcott Road. Floodplain restoration, re-establishing a former flood chute, revegetation of the floodplain, and bank stabilization are all proposed measures to help restore the floodplain and reduce future fluvial erosion/ phosphorus loading. All measures would help protect the eroding stream bank as well as improve floodplain access and provide critical flood mitigation benefits. The LCPC has held past site visits and meetings with the DEC Rivers Program and the Vermont River Conservancy to support the development of this project. In 2020, SLR International Corporation conducted a Flood Mitigation Study along North Wolcott Road identifying this site as a potential location for floodplain restoration. In 2025, SLR updated the floodplain restoration concept design. This section along North Wolcott Road has been repeatedly damaged during flooding events causing streambank erosion. The Wild Branch stream channel along this stretch has migrated between 50-100 feet between 2020 and the end of 2023. Since 1995 the northern project section of the Wild Branch channel migrated 310 ft. Meanwhile in the southern project section the stream channel has moved 260 ft. A significant amount of this channel migration took place during the following flooding events: the 2018 ice jam and flood, the Halloween Storm of 2019, the July 2023 flood,and December 2023 flood. The most notable damage within the proposed project area was during the January 2018 ice jam. The ice jam and flooding caused a complete road washout and took out a utility pole near address 2082 North Wolcott Road. The North Wolcott Road was closed in this location for two weeks following the 2018 ice jam. The Wild Branch stream channel is currently undermining North Wolcott Road. The Town installed limited riprap as a temporary fix to protect the road and nearby homes, but without further stabilization, North Wolcott Road will continue to be undermined. North Wolcott Road is a Class 2 town highway that connects two state highways (VT-Route 14 and Route 15) and is heavily traveled by commuters and truck traffic. The Lamoille County Planning Commission conducted three traffic counts on North Wolcott Road in 2023, capturing an average daily traffic volume of nearly 2,000 vehicles per day that are at risk of being re-routed with long detours.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity