North Florida Recharge Project Treatment Wetland and Recharge Facility Investigation, Selection and
Closed State & local contract opportunity Posted
- Solicitation number
- RFSQ-13099
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 92517 Civil Engineering
- 92641 Ecosystems Development, Management And Protection Services
- 96296 Well Services (Including Oil, Gas, And Water): Drilling, Plugging, Consulting, Maintenance, Repair, Etc.
- 92597 Water Supply, Treatment, And Distribution/Engineering
- 92548 Harbors; Jetties; Piers; Ship Terminal Facilities - Engineering
- 92588 Structural Engineering
- 92523 Dam Engineering
- UNSPSC codes
- 81101500 Civil engineering
- 81101501 Well engineering
- 81101503 Harbor or water ports engineering
- 81101505 Structural engineering
- 70161710 Wetland ecology and conservation service
- 71123001 Management and provision of all facilities engineering modification and maintenance services for a site or platform
- 81101507 Dam engineering
- 81101508 Architectural engineering
- Point of contact
-
- Kendall Siemiatkoski ksiemiat@sjrwmd.com (386) 312-2324
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The St. Johns River Water Management District, in collaboration with multiple regional water and utility authorities, is issuing a Request for Qualifications (RFQ 41325) to select an engineering consulting firm for the North Florida Recharge Project. The procurement seeks professional services to conduct a comprehensive treatment wetland and recharge facility site investigation, with the primary objective of developing a regional water supply project addressing minimum flows and levels for the Lower Santa Fe and Ichetucknee Rivers and priority springs. The selected firm will be responsible for investigating potential sites for a 40 million gallons per day reclaimed water treatment and recharge system, including transmission infrastructure, treatment wetlands, and recharge facilities. Evaluation criteria will focus on professional qualifications, project approach, key personnel experience, location, and previous work with the district. The RFQ response is due by 2:00 p.m. on July 28, 2025, with a non-mandatory pre-submittal conference scheduled for June 26, 2025. Respondents must demonstrate expertise in hydrogeology, groundwater modeling, regulatory permitting, water treatment, and minimum flows and levels compliance.
The contract will be awarded through a qualifications-based selection process, with no specific set-aside designations or restrictions on organizational types mentioned in the documentation. The total estimated budget for the project is $2,170,000, with funding anticipated from the Florida Department of Environmental Protection's Alternative Water Supply Program. The contract is set to expire on June 30, 2028, and will be executed in Polk County, Florida. The district reserves the right to reject any or all submissions and may negotiate with the highest-ranked respondents. While no incumbent vendors are explicitly identified, the project involves collaborative efforts between the St. Johns River Water Management District, Suwannee River Water Management District, Florida Department of Environmental Protection, JEA, Clay County Utility Authority, Gainesville Regional Utilities, and St. Johns County Utilities Department. The project will require extensive technical analysis, including multiple workshops and technical memoranda to assess and recommend treatment wetland and recharge facility sites.
Opportunity text
The objective of this solicitation is to select and enter into an agreement with an engineering firm to conduct a treatment wetland site and recharge site investigation and provide siting recommendations. The work performed under the agreement would identify and evaluate treatment wetland and recharge sites for construction of treatment wetland(s) for additional treatment of the JEA Buckman and Southwest Water Reclamation Facility's reclaimed water which would be used for Minimum Flow and Level prevention and recovery efforts and for aquifer enhancement at aquifer recharge sites (the "Project").
Information regarding the Project can be found in Attachment A - Statement of Work included with this solicitation.
The contract issued pursuant to this solicitation will expire June 30, 2028. The budget for this Agreement is estimated to be $2,170,000.
Files
| File | Type | Posted |
|---|---|---|
| RFQ 41325-NFRPWetland&Recharge Investigation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity